Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

3 Conway Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Proposed installation of solar panels on rooftop of Single Family Dwelling

    Applied Nov 25, 2021 · issued Dec 22, 2021 · completed Nov 15, 2022 · Permit 21 241929 BLD

    Closed
  • Drains and site services

    Drain - Proposed renovations (85m2) to existing two storey single family semi detached dwelling.

    Applied Jul 31, 2017 · issued Jul 31, 2017 · completed Nov 2, 2017 · Permit 17 199728 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposed renovations (85m2) to existing two storey single family semi detached dwelling.

    Applied Jul 18, 2017 · issued Jul 28, 2017 · completed Nov 7, 2017 · Permit 17 199728 HVA

    Closed
  • Plumbing

    Plumbing - Proposed renovations (85m2) to existing two storey single family semi detached dwelling.

    Applied Jul 17, 2017 · issued Jul 28, 2017 · completed Nov 2, 2017 · Permit 17 199728 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed renovations (85m2) to existing two storey single family semi detached dwelling.

    Applied Jul 17, 2017 · issued Jul 28, 2017 · completed Nov 2, 2017 · Permit 17 199728 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 281 Oakwood Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front one-storey addition (reconstruction of the existing enclosed porch).

    250 m away · filed Apr 29, 2026 · Approved

  • 27 Conway Ave · Minor variance

    To construct a new one-storey ancillary building (to contain one garden suite) in the rear yard. There will be a total of four residential dwelling units on this lot (three units occupying the main dwelling and one unit occupying the ancillary building).

    80 m away · filed Mar 10, 2026 · Approved

  • 49 Appleton Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition with a covered rear ground floor deck with stairs.

    190 m away · filed Aug 19, 2025 · Approved

  • 159 Glenholme Ave · Minor variance

    To construct a new two-storey ancillary building (containing one garden suite), in the rear yard, of an existing two-storey detached dwelling.

    230 m away · filed Apr 26, 2024 · Deferred

  • 83 Robina Ave · Minor variance

    To reconstruct the roof of the existing ancillary building (detached storage garage), located in the rear yard of the property.

    160 m away · filed Oct 31, 2023 · Approved

  • 40 Glenhurst Ave · Minor variance

    To construct a new two-storey ancillary building (garden suite with a cantilevered second storey) in the rear yard. The existing one-storey detached garage will be demolished.

    120 m away · filed Sep 18, 2023 · Refused

  • 206 Oakwood Ave · Minor variance

    To convert the existing rear one-storey ancillary building (detached garage) into a garden suite.

    90 m away · filed Apr 21, 2023 · Approved

  • 54 Appleton Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by reconstructing the third floor and constructing a rooftop deck.

    190 m away · filed Aug 10, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.