Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

3 Rosecliffe Ave

The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    REVISION 02 - Proposed revision to show the existing basement layout. REVISION 01 - Proposed revised layout, a new two storey rear addition and new detached garageProposed interior alterations to an existing 2 storey SFD-detached dwelling.

    Applied May 1, 2026 · issued Jun 12, 2026 · Permit 23 227939 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed interior alterations to an existing 2 storey SFD-detached dwelling.

    Applied Oct 28, 2025 · issued Nov 6, 2025 · Permit 23 227939 HVA

    Permit issued
  • Small residential project · Addition(s)

    REVISION 01 - Proposed revised layout, a new two storey rear addition and new detached garageProposed interior alterations to an existing 2 storey SFD-detached dwelling.

    Applied Feb 28, 2025 · issued Sep 22, 2025 · Permit 23 227939 BLD (revision 01)

    Revision issued
  • Small residential project · Garage

    Proposed detached garage for existing single family dwelling.

    Applied Mar 21, 2024 · completed Mar 26, 2024 · Permit 24 128185 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal to construct a 2 storey rear addition and interior alterations to an existing 2 storey SFD-detached dwelling.

    Applied Nov 20, 2023 · issued Dec 1, 2023 · Permit 23 227939 PLB

    Inspections under way
  • Small residential project · Addition(s)

    Proposed interior alterations to an existing 2 storey SFD-detached dwelling.

    Applied Nov 20, 2023 · issued Dec 1, 2023 · Permit 23 227939 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and to maintain the rear one-storey addition (abutting the west portion of the existing rear one-storey east side addition), as well as the complete second storey addition. There will be a rear ground level deck with stairs. Also, to legalize and to maintain the new one-storey detached ancillary building (one-car garage) in the rear yard. These additions have been constructed without an authorized building permit(s).

    Decision: Approved (hearing Aug 20, 2025)

    Filed May 2, 2025 · File A0339/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 75 Sellers Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).

    120 m away · filed Nov 4, 2025 · Approved

  • 135 Sellers Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition with entrance stairs on the ground floor and a complete third storey addition.

    200 m away · filed May 2, 2025 · Postponed

  • 247 Westmount Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (including a window projection at the north side). Also, to reconstruct the existing rear deck with stairs. There will be two residential dwelling units on this lot.

    170 m away · filed Apr 3, 2025 · Approved

  • 95 Day Ave · Minor variance

    To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.

    210 m away · filed Jan 13, 2025 · Approved

  • 2004 Dufferin St · Minor variance

    To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway), into one two-storey laneway suite by constructing a complete second storey and a ground floor terrace (on the east side).

    240 m away · filed Aug 8, 2024 · Approved

  • 86 Day Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.

    250 m away · filed Jun 12, 2024 · Approved

  • 1966 Dufferin St · Minor variance

    To construct a new two-storey ancillary building (laneway suite with cantilevered second storey on the west side), in the rear yard, abutting the laneway. The existing ancillary building (detached garage) will be demolished. The existing detached two-and-one-half-storey main dwelling on the lot will remain unaltered.

    120 m away · filed Jan 22, 2024 · Approved

  • 44 Morrison Ave · Minor variance

    To legalize and to maintain the rear one-storey addition to the existing one-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.

    250 m away · filed Jun 7, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.