The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied May 28, 2025 · issued Jul 2, 2025 · completed Mar 5, 2026 · Permit 24 219076 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied May 28, 2025 · issued May 28, 2025 · completed Mar 5, 2026 · Permit 24 219076 PLB

    Closed
  • Small residential project · Multiple projects

    Revision 01: Changes to the interior layout Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied May 28, 2025 · issued Jun 20, 2025 · completed Jun 12, 2026 · Permit 24 219076 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied Sep 27, 2024 · issued Jan 24, 2025 · completed Mar 5, 2026 · Permit 24 219076 HVA

    Closed
  • Small residential project · Multiple projects

    Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied Sep 27, 2024 · issued Oct 28, 2024 · completed Jun 12, 2026 · Permit 24 219076 BLD

    Closed
  • Drains and site services

    Drain - Proposed multiple projects for rear one-storey addition, third-floor addition and basement underpinning to existing single family dwelling.

    Applied Sep 27, 2024 · issued Oct 28, 2024 · completed Mar 21, 2025 · Permit 24 219076 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.

    Decision: Approved (hearing Aug 7, 2024)

    Filed Jun 12, 2024 · File A0535/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 75 Sellers Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).

    140 m away · filed Nov 4, 2025 · Approved

  • 135 Sellers Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition with entrance stairs on the ground floor and a complete third storey addition.

    190 m away · filed May 2, 2025 · Postponed

  • 3 Rosecliffe Ave · Minor variance

    To legalize and to maintain the rear one-storey addition (abutting the west portion of the existing rear one-storey east side addition), as well as the complete second storey addition. There will be a rear ground level deck with stairs. Also, to legalize and to maintain the new one-storey detached ancillary building (one-car garage) in the rear yard. These additions have been constructed without an authorized building permit(s).

    250 m away · filed May 2, 2025 · Approved

  • 95 Day Ave · Minor variance

    To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.

    60 m away · filed Jan 13, 2025 · Approved

  • 164 Day Ave · Minor variance

    To permit the existing one-storey detached dwelling by converting the enclosed front porch into habitable space, and to construct a new covered front porch and stairs.

    240 m away · filed May 27, 2024 · Approved

  • 1966 Dufferin St · Minor variance

    To construct a new two-storey ancillary building (laneway suite with cantilevered second storey on the west side), in the rear yard, abutting the laneway. The existing ancillary building (detached garage) will be demolished. The existing detached two-and-one-half-storey main dwelling on the lot will remain unaltered.

    190 m away · filed Jan 22, 2024 · Approved

  • 44 Morrison Ave · Minor variance

    To legalize and to maintain the rear one-storey addition to the existing one-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.

    150 m away · filed Jun 7, 2023 · Approved

  • 17 Day Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition and new stairs.

    210 m away · filed Apr 25, 2023 · Withdrawn

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.