Toronto address · Ward 3, Etobicoke-Lakeshore
300 Birmingham St
Humber Arts & Media Studio (Humber Lakeshore Campus)
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Rev 01 - Modification to backflow preventerInstalling two new backflow preventers to existing water service and an expansion tank
Applied Oct 9, 2023 · issued Dec 7, 2023 · completed Nov 25, 2024 · Permit 23 141615 PSA (revision 01)
- Closed
Plumbing · Backflow prevention devices (Water only)
Installing two new backflow preventers to existing water service and an expansion tank
Applied May 4, 2023 · issued Jun 5, 2023 · completed Nov 25, 2024 · Permit 23 141615 PSA
- Closed (dormant)
Plumbing · Other
New pool filter replacement at Gus Ryder Community Pool.
Applied Feb 23, 2005 · issued Mar 23, 2005 · completed Jun 8, 2026 · Permit 05 110847 PSA
- Closed (dormant)
Non-residential building permit · Alteration to existing building
Elevator to "Lakeshore Lions Arena" building. HVAC & Plumbing included
Applied Aug 10, 2000 · issued Sep 18, 2000 · completed Jun 8, 2026 · Permit 00 326909 CMB
- Closed (dormant)
Non-residential building permit · Alteration to existing building
Interior alterations to arena. HVAC Drawings and plumbing permits included.
Applied Jul 31, 2000 · issued Sep 13, 2000 · completed Jun 8, 2026 · Permit 00 323652 CMB
- Closed (dormant)
Non-residential building permit · Alteration to existing building
"Lakeshore Lions Arens Inc.." Interior alterations. HVAC and plumbing permits included.
Applied Jun 27, 2000 · issued Jul 26, 2000 · completed Jun 8, 2026 · Permit 00 166374 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
76 Twenty Fourth St · Minor variance
To construct a new fourplex
210 m away · filed Aug 5, 2025 · Approved
77 Twenty Second St · Minor variance
To construct a second storey addition above the existing dwelling and a new front porch.
80 m away · filed Jul 30, 2025 · Approved
53 Twenty Fourth St · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed Jan 23, 2024 · Approved
30 Nineteenth St · Minor variance
To construct a second storey addition above the existing dwelling and a new covered front porch.
230 m away · filed Mar 29, 2023 · Approved
33 Twenty First St · Minor variance
To construct a second storey rear platform. A previous Committee of Adjustment application (A0916/17EYK) approved variances related to floor space index, side yard setback, parking space width, driveway width, dwelling height, front and rear exterior main wall height.
180 m away · filed Aug 30, 2022 · Approved
40 Twenty First St · Minor variance
To construct a new detached dwelling. The existing detached garage in the rear yard will be maintained.
160 m away · filed Aug 16, 2022 · Approved
44 Nineteenth St · Minor variance
Proposed basement extension, addition on ground and 2nd floor at rear. Interior alterations.
180 m away · filed Dec 29, 2021 · Application withdrawn
350 Kipling Ave · Minor variance
To construct a new air supported structure affiliated with a sports field. This application will be considered in conjunction with Application number A0623/21EYK (290 Birmingham Street).
220 m away · filed Dec 13, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.