Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

302 Bay St

The City of Toronto has 28 building permits since 2017 (13 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    REV 1: ELEVATOR LOBBIES, CEILING FIRE RATINGS (8TH-14TH), 8TH & 9TH FLOOR LAYOUTS.Proposal for interior alterations to existing office space on floors 4-12 and 14-15 - "IQ Office"

    Applied Oct 30, 2024 · issued Nov 28, 2024 · Permit 23 238606 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REV 1: ELEVATOR LOBBIES, CEILING FIRE RATINGS (8TH-14TH), 8TH & 9TH FLOOR LAYOUTS.HVAC - Proposal for interior alterations to existing office space on floors 4-7 and 14-15 - "IQ Office"2024-02-23 - The revision is to add alterations on the 8th to 12th floor, so that the entire scope of the permit will be for 4th-12th, and 14th to 15th floor.

    Applied Oct 30, 2024 · issued Nov 26, 2024 · Permit 23 238606 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision #2 Altering the overhead wet sprinkler system over floors 4-14 of an existing building to suit new partition and office layoutREVISION 01: Installing an overhead wet sprinkler system in a return to base project over floors 3 to 15 of an existing building.BACK TO BASE - FLOORS 3-15

    Applied May 27, 2024 · issued Jun 25, 2024 · Permit 23 126769 BLD (revision 02)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations to existing office space on floors 4-7 and 14-15 - "IQ Office"2024-02-27 - The revision is to add alterations on the 8th to 12th floor, so that the entire scope of the permit will be for 4th-12th, and 14th to 15th floor.

    Applied Dec 27, 2023 · issued Mar 22, 2024 · Permit 23 238606 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office space on floors 4-7 and 14-15 - "IQ Office"2024-02-23 - The revision is to add alterations on the 8th to 12th floor, so that the entire scope of the permit will be for 4th-12th, and 14th to 15th floor.

    Applied Dec 27, 2023 · issued Mar 22, 2024 · Permit 23 238606 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office space on floors 4-12 and 14-15 - "IQ Office"

    Applied Dec 27, 2023 · issued Mar 22, 2024 · Permit 23 238606 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    REVISION 01: Installing an overhead wet sprinkler system in a return to base project over floors 3 to 15 of an existing building.BACK TO BASE - FLOORS 3-15

    Applied Oct 12, 2023 · issued Nov 9, 2023 · Permit 23 126769 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the first, second and third floors of an existing office building.

    Applied Jul 11, 2023 · issued Jan 16, 2024 · Permit 23 172523 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to the first, second and third floors of an existing office building.

    Applied Jul 11, 2023 · issued Jan 16, 2024 · Permit 23 172523 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the first, second and third floors of an existing office building.

    Applied Jul 11, 2023 · issued Jan 16, 2024 · Permit 23 172523 HVA

    Inspections under way
  • Heating and ventilation

    Hvac - back to base - floors 3-15

    Applied Mar 24, 2023 · issued May 16, 2023 · Permit 23 126769 HVA

    Permit issued
  • Plumbing

    Plumbing - BACK TO BASE - FLOORS 3-15

    Applied Mar 24, 2023 · issued May 16, 2023 · Permit 23 126769 PLB

    Permit issued
Show 16 more permits
  • Addition or alteration · Interior alterations

    Back to base - floors 3-15

    Applied Mar 24, 2023 · issued May 8, 2023 · Permit 23 126769 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to an existing office space on the third floor.

    Applied Dec 27, 2019 · issued Jan 30, 2020 · completed Jan 21, 2026 · Permit 19 265065 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an existing office space on the third floor.

    Applied Dec 27, 2019 · issued Jan 30, 2020 · completed Feb 3, 2026 · Permit 19 265065 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an existing office space on the third floor.

    Applied Dec 27, 2019 · issued Jan 30, 2020 · completed Nov 4, 2025 · Permit 19 265065 HVA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install new magnetic locking device to existing door in an existing office.

    Applied Jan 17, 2019 · issued Jan 17, 2019 · completed Oct 10, 2019 · Permit 19 105441 FSU

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 2 new backflow prevention devices and expansion tank for premise isolation for office building.

    Applied Jun 6, 2018 · issued Jul 11, 2018 · completed Oct 30, 2018 · Permit 18 173180 PSA

    Closed
  • Addition or alteration · Interior alterations

    permit for interior alterations to existing office space - floor 5 - BMO

    Applied Jan 25, 2012 · issued Jan 31, 2012 · completed Feb 8, 2019 · Permit 12 111969 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    This is for the installation of two(2) electromagnetic locks on the 10th and 11th floor.

    Applied Oct 28, 2011 · issued Nov 9, 2011 · completed Feb 26, 2019 · Permit 11 301254 FSU

    Closed
  • Plumbing

    Plumbing - Interior alterations to an existing office space on the 15th floor

    Applied Jul 18, 2006 · issued Jul 18, 2006 · completed Jul 17, 2019 · Permit 06 149534 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to an existing office space on the 15th floor

    Applied Jun 22, 2006 · issued Jul 6, 2006 · completed Feb 12, 2019 · Permit 06 149534 HVA

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing office on the 8th floor. - Interior Alterations

    Applied May 3, 2006 · issued May 8, 2006 · completed Jan 30, 2019 · Permit 06 131122 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing office on the 8th floor.

    Applied May 3, 2006 · issued May 8, 2006 · completed Feb 8, 2019 · Permit 06 131122 BLD

    Closed
  • Plumbing

    Plumbing - Make interior alterations to portions of 14th floor. - Interior Alterations

    Applied Feb 10, 2006 · issued Feb 15, 2006 · completed Jul 17, 2019 · Permit 06 108687 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to offices on 7th and 9th floors - Interior Alterations

    Applied Oct 28, 2005 · issued Nov 3, 2005 · completed Mar 26, 2019 · Permit 05 195545 HVA

    Closed
  • Heating and ventilation

    Hvac -5th floor

    Applied Jun 21, 2002 · issued Jun 27, 2002 · completed Jan 30, 2019 · Permit 02 143104 HVA

    Closed
  • Heating and ventilation · Install/Alter HVAC - only

    H.V.A.C. alter ductwork on 12th floor existing office. tenant: nesbitt burns. designated: historical. cost included in 00-362759 edc

    Applied Dec 19, 2000 · issued Jan 17, 2001 · completed May 10, 2019 · Permit 00 362771 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 121 King St W · Minor variance

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    250 m away · filed May 19, 2026 · Approved

  • 20 King St W · Minor variance

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    150 m away · filed May 6, 2026 · Approved

  • 67 Richmond St W · Minor variance

    To construct an outdoor patio in the West side yard and rear yard of the existing seven-storey mixed-use building.

    190 m away · filed Dec 18, 2020 · Approved

  • 330 Bay St · Minor variance

    To alter the existing 11-storey mixed-use building by increasing the usable floor area at the first and second storey.

    90 m away · filed Sep 16, 2020 · Approved

  • 365 Bay St · Minor variance

    To alter the existing commercial building by converting the basement, ground, and mezzanine levels to an eating establishment (greater than 30 seats). An expansion of the existing mezzanine will be constructed to accommodate mechanical space, elevators and access stairs.

    190 m away · filed Sep 27, 2017 · Approved

  • 85 Richmond St W · Minor variance

    To alter the existing office building by facilitating heritage restoration, recladding and the addition of non-residential gross floor area to the rear of the building.

    220 m away · filed May 15, 2017 · Approved

  • 120 Adelaide St W · Minor variance

    To facilitate the recladding of the existing office building and a reconfiguration of Open Space on the lot to facilitate new directory signage and new restaurant patio spaces.

    200 m away · filed Nov 22, 2016 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.