Toronto address · Ward 22, Scarborough-Agincourt
3025 Kennedy Rd
The City of Toronto has 15 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision: washroom layout, office layout
Applied Mar 23, 2026 · issued Mar 30, 2026 · completed Jul 3, 2026 · Permit 18 224843 HVA (revision 01)
- Closed
Addition or alteration · Multiple projects
Revision: skylight, washroom layout, office layout, new windows and structural design
Applied Mar 13, 2026 · issued Apr 22, 2026 · completed Sep 14, 2026 · Permit 18 224843 BLD (revision 03)
- Closed
Plumbing
Rev 02: relocation of floor drains and sanitary linesREVISION 01: proposed relocation of floor drainsPlumbing - interior alterations, alterations to front facade
Applied Feb 3, 2026 · issued Feb 6, 2026 · completed Aug 12, 2026 · Permit 18 224843 PLB (revision 02)
- Issuance pending
Plumbing
Plumbing - Proposed interior alterations to convert existing warehouse and office into church.
Applied Jan 24, 2025 · Permit 25 108516 PLB
- Under review
Addition or alteration · Interior alterations
Proposed interior alterations to convert existing warehouse and office into church.
Applied Jan 24, 2025 · Permit 25 108516 BLD
- Issuance pending
Heating and ventilation
HVAC - Proposed interior alterations to convert existing warehouse and office into church.
Applied Jan 24, 2025 · Permit 25 108516 HVA
- Closed
Plumbing
REVISION 01: proposed relocation of floor drainsPlumbing - interior alterations, alterations to front facade
Applied Sep 17, 2024 · issued Dec 2, 2024 · completed Aug 12, 2026 · Permit 18 224843 PLB (revision 01)
- Cancelled
Addition or alteration · Multiple projects
REVISION 02Int Alt to # 18 224843 BLD 01 BA Offices, Kitchen, HVAC unit, Exhaust Fans, Drains, Make up Air unit,Exhaust Hood , Grease interceptor Revision 01 - New windows at front south side and north rear elevations, two new roof top HVAC units at the roof, and decorative storyfoam added to the walls.interior alterations, alterations to front facadeRef: Permit - 99 103019 COM 00 NR & MINOR VARIANCE - A078/03SC (use permitted)
Applied Apr 16, 2024 · completed Jan 8, 2025 · Permit 18 224843 BLD (revision 02)
- Closed
Addition or alteration · Multiple projects
Revision 01 - New windows at front south side and north rear elevations, two new roof top HVAC units at the roof, and decorative storyfoam added to the walls.interior alterations, alterations to front facadeRef: Permit - 99 103019 COM 00 NR & MINOR VARIANCE - A078/03SC (use permitted)
Applied Jul 6, 2023 · issued Jul 15, 2025 · completed Sep 14, 2026 · Permit 18 224843 BLD (revision 01)
- Closed
Addition or alteration · Multiple projects
interior alterations, alterations to front facadeRef: Permit - 99 103019 COM 00 NR & MINOR VARIANCE - A078/03SC (use permitted)
Applied Sep 13, 2018 · issued May 1, 2019 · completed Sep 14, 2026 · Permit 18 224843 BLD
- Closed
Heating and ventilation
HVAC - interior alterations, alterations to front facade
Applied Sep 13, 2018 · issued Jul 3, 2025 · completed Jul 3, 2026 · Permit 18 224843 HVA
- Closed
Plumbing
Plumbing - interior alterations, alterations to front facade
Applied Sep 13, 2018 · issued Apr 8, 2024 · completed Aug 12, 2026 · Permit 18 224843 PLB
Show 3 more permits
- Inspections under way
Heating and ventilation
HVAC - Interior alterations - Unit 9
Applied Apr 19, 2016 · issued May 24, 2016 · Permit 16 126093 HVA
- Permit issued
Addition or alteration · Interior alterations
Interior alterations - Unit 9
Applied Mar 10, 2016 · issued May 24, 2016 · Permit 16 126093 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations - Unit 9
Applied Mar 10, 2016 · issued May 24, 2016 · Permit 16 126093 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
3 storeys · 171 homes · Residential
180 m away · Site plan · Under review · filed Aug 28, 2026
- Under review
Not stated in the file
180 m away · Rezoning · Under review · filed Aug 28, 2026
- Under review
- Approved
Neighbours’ Committee of Adjustment files within 250 m
3000 Kennedy Rd · Minor variance
To alter the development standards for the residential townhouse development by eliminating all indoor amenity space, decreasing minimum required building setbacks, and increasing maximum permitted building heights and projections for building operational equipment. Also, to permit undersized parking spaces on-site. Cross-reference Zoning By-law Amendment Application 23 206748 ESC 22 OZ.
170 m away · filed Apr 25, 2025 · Deferred
3000 Kennedy Rd · Minor variance
To permit the registration of a Draft Plan of Subdivision in order to create 42 residential lots. Cross-Reference Draft Plan of Subdivision Application 16 256254 ESC 39 SB.
170 m away · filed Dec 21, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.