Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

3027 Bathurst St

The City of Toronto has 6 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Fixtures/Roof Drains: other

    replace plumbing fixtures & piping

    Applied May 28, 2019 · issued Jun 19, 2019 · completed Jul 17, 2019 · Permit 19 161371 PSA

    Closed
  • Plumbing · Fixtures/Roof Drains: other

    Proposed replacement of piping and fixtures to update existing plumbing in an eating establishment.

    Applied Feb 20, 2019 · completed Apr 2, 2019 · Permit 19 117311 PSA

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Installation of back flow preventer

    Applied Aug 9, 2018 · issued Aug 23, 2018 · completed Jun 26, 2019 · Permit 18 206875 PSA

    Closed
  • Heating and ventilation · Other

    Proposal to install a Heat Removal System for a pizza oven in an existing ground floor restaurant, less than 30 seats.

    Applied Oct 2, 2017 · issued Oct 19, 2017 · completed Jul 12, 2019 · Permit 17 241622 MSA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to ground floor commercial unit to change use from fish market to bakery.

    Applied Aug 8, 2014 · issued Sep 3, 2014 · Permit 14 203390 BLD

    Inspections under way
  • Heating and ventilation

    HVAC & Kitchen Exhaust - Interior alterations to ground floro commercial unit to change use from fish market to bakery.

    Applied Aug 8, 2014 · issued Sep 3, 2014 · Permit 14 203390 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 68 Stormont Ave · Minor variance

    To construct a second storey addition to the existing dwelling, a two-storey addition to the rear of the dwelling and a secondary suite in the basement in conjunction with other interior and exterior alterations.

    200 m away · filed Apr 28, 2026 · Approved

  • 9 Fairholme Ave · Minor variance

    Too legalize and maintain the existing rear deck

    90 m away · filed Jan 21, 2026 · Approved

  • 2989 Bathurst St · Minor variance

    To help facilitate in the construction of a 9-storey building with 27 residential units, 1 office unit, and 1 retail unit. Please note, this application was previously deferred Thursday, June 12, 2025.

    130 m away · filed Apr 14, 2025 · Approved

  • 3036-3050 Bathurst St · Minor variance

    To provide fire rated accessible recycling & organic garbage room in Under Ground Parking Garage in order to comply with fire code notice. The proposed Garbage Room will take three existing parking spaces in the Under Ground Parking Lot. NOTE: This application was previously deferred at the Committee of Adjustment hearing on June 20, 2024.

    70 m away · filed Apr 23, 2024 · Approved

  • 74 Glen Rush Blvd · Minor variance

    Proposal to construct new two-storey front addition, porch, walkway and to modify an existing parking space.

    200 m away · filed Dec 23, 2022 · Approved

  • 521 Glengarry Ave · Minor variance

    To construct a new two-storey front addition with interior alterations, front concrete porch and rear wood deck.

    230 m away · filed Feb 27, 2021 · Approved

  • 30 Fairholme Ave · Minor variance

    To construct a new dwelling.

    250 m away · filed Jan 21, 2021 · Approved

  • 22 Fairholme Ave · Minor variance

    To construct a new dwelling.

    190 m away · filed Dec 17, 2020 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.