Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

3075 Bathurst St

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to replace one 4 ton roof top unit with a new 5 ton unit.

    Applied May 28, 2020 · completed Jul 28, 2020 · Permit 20 149757 MSA

    Cancelled
  • Designated structure · Sign building permit related

    In conjunction with a gas station and convenient store on the premises, proposal to erect and display two ground signs, two overhanging structure signs and one wall sign, all illuminated and displaying static copy. One of the proposed ground signs is located on the south elevation, containing two sign faces, each sign face measuring 5.07 metres vertically by 2.01 metres horizontally at a height of 6.0 metres. One of the proposed ground signs is located on the west elevation, containing two sign faces, each sign face measuring 2.43 metres vertically by 3.67 metres horizontally at a height of 3…

    Applied Jun 8, 2018 · issued Mar 14, 2019 · completed Apr 21, 2021 · Permit 18 173098 DST

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Install one 1 inch backflow preventer for Shell Canada.

    Applied Jun 8, 2011 · issued Jun 22, 2011 · completed Nov 28, 2025 · Permit 11 214171 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 68 Stormont Ave · Minor variance

    To construct a second storey addition to the existing dwelling, a two-storey addition to the rear of the dwelling and a secondary suite in the basement in conjunction with other interior and exterior alterations.

    200 m away · filed Apr 28, 2026 · Approved

  • 547 Douglas Ave · Consent

    To obtain consent to sever the property into two to create a new residential lot.File Numbers B0007/26NY, A0123/26NY & A0124/26NY will be considered jointly.

    130 m away · filed Mar 20, 2026 · Hearing scheduled

  • 547 Douglas Ave · Minor variance

    To construct a new detached dwelling with a rear deck. File Numbers B0007/26NY, A0123/26NY & A0124/26NY will be considered jointly.

    130 m away · filed Mar 20, 2026 · Hearing scheduled

  • 547 Douglas Ave · Minor variance

    To construct a new detached dwelling with a rear deck. File Numbers B0007/26NY, A0123/26NY & A0124/26NY will be considered jointly.

    130 m away · filed Mar 20, 2026 · Hearing scheduled

  • 9 Fairholme Ave · Minor variance

    Too legalize and maintain the existing rear deck

    190 m away · filed Jan 21, 2026 · Approved

  • 3036-3050 Bathurst St · Minor variance

    To provide fire rated accessible recycling & organic garbage room in Under Ground Parking Garage in order to comply with fire code notice. The proposed Garbage Room will take three existing parking spaces in the Under Ground Parking Lot. NOTE: This application was previously deferred at the Committee of Adjustment hearing on June 20, 2024.

    140 m away · filed Apr 23, 2024 · Approved

  • 515 Glengarry Ave · Minor variance

    Proposal to renew the rear deck and change the stairs layout

    150 m away · filed Mar 10, 2022 · Approved

  • 521 Glengarry Ave · Minor variance

    To construct a new two-storey front addition with interior alterations, front concrete porch and rear wood deck.

    110 m away · filed Feb 27, 2021 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.