Toronto address · Ward 9, Davenport
308 Salem Ave
The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Second suite (New)
Proposal to create a 3rd suite at the basement floor.
Applied Jul 14, 2017 · issued Jun 12, 2018 · completed Jan 18, 2019 · 2 homes added · Permit 17 198638 BLD
- Closed
Drains and site services
Drain - Proposal to create a 3rd suite at the basement, see original permit 15-152316
Applied Jul 14, 2017 · issued Jan 3, 2019 · completed Jan 18, 2019 · Permit 17 198638 DRN
- Closed
Plumbing
Plumbing - Proposal to create a 3rd suite at the basement, see original permit 15-152316
Applied Jul 14, 2017 · issued Jan 3, 2019 · completed Jan 18, 2019 · Permit 17 198638 PLB
- Closed
Small residential project · Multiple projects
Rev 01: Underpin Basement.2-Storey rear addition, interior alterations, creation of 2nd suite, and reduction in size of existing front porch, in existing 2-Storey Single Family Detached House.
Applied Feb 1, 2016 · issued Feb 1, 2016 · completed Jun 8, 2018 · Permit 15 152316 BLD (revision 01)
- Closed
Drains and site services
Drain - 2-Storey rear addition, interior alterations, creation of 2nd suite, and reduction in size of existing front porch, in existing 2-Storey Single Family Detached House.
Applied Feb 1, 2016 · issued Feb 1, 2016 · completed May 23, 2018 · Permit 15 152316 DRN
- Closed
Small residential project · Multiple projects
2-Storey rear addition, interior alterations, creation of 2nd suite, and reduction in size of existing front porch, in existing 2-Storey Single Family Detached House.
Applied May 6, 2015 · issued May 20, 2015 · completed Jun 8, 2018 · 1 home added · Permit 15 152316 BLD
- Closed
Plumbing
Plumbing - 2-Storey rear addition, interior alterations, creation of 2nd suite, and reduction in size of existing front porch, in existing 2-Storey Single Family Detached House.
Applied May 6, 2015 · issued May 28, 2015 · completed May 15, 2018 · Permit 15 152316 PLB
- Closed
Heating and ventilation
HVAC - 2-Storey rear addition, interior alterations, creation of 2nd suite, and reduction in size of existing front porch, in existing 2-Storey Single Family Detached House.
Applied May 6, 2015 · issued May 22, 2015 · completed May 15, 2018 · Permit 15 152316 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2½-storey detached dwelling containing two dwelling units by adding a third dwelling unit in the basement.
Decision: Approved (hearing May 30, 2017)
Filed Jan 30, 2017 · File A0103/17TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
220 m away · filed Jan 15, 2026 · Approved
815 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by converting the existing front integral garage into habitable space. Also, to install a front yard parking pad (to replace the existing reverse slope driveway, which will be filled in), abutting Gladstone Avenue.
180 m away · filed Apr 17, 2025 · Application withdrawn
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
240 m away · filed Jan 23, 2024 · Approved
208 Bartlett Ave · Minor variance
To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.
250 m away · filed Nov 2, 2023 · Approved
314 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling (currently under construction, as approved by Minor Variance Application Number A1089/21TEY) by constructing a rear exterior staircase (three levels). Also, to install a secondary suite on the second and third storeys.
110 m away · filed Oct 30, 2023 · Approved
208 Bartlett Ave · Minor variance
To construct a new three-storey apartment building with front and rear balconies on the second and third floors. There will be a total of 10 dwelling units on this lot. All existing buildings will be demolished.
250 m away · filed Jun 2, 2023 · Refused
270 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition with a third storey deck, new side exterior stairs leading to the first and second storeys, and a new rear first storey deck.
130 m away · filed Mar 6, 2023 · Approved
819 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a full third storey addition, a rear two storey addition, a second storey front terrace, a third storey rear terrace, and a front porch as approved by Minor Variance Decision A0445/21TEY. The current application is necessitated to correctly identify the gross floor area (as cited in Variance Number 1 below), which was not included as part of the previous approval.
180 m away · filed Sep 28, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.