Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

31 Hoyle Ave

The City of Toronto has 6 building permits since 2017 (1 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    New aluminum pergola on the existing rear deck

    Applied Jan 27, 2025 · issued Jan 28, 2025 · Permit 25 109327 BLD

    Permit issued
  • Drains and site services

    Drain - Demolish existing dwelling to construct new two storey dwelling with integral garage

    Applied Sep 3, 2019 · issued Nov 29, 2019 · completed Jul 21, 2021 · Permit 19 215413 DRN

    Closed
  • Heating and ventilation

    HVAC - Demolish existing dwelling to construct new two storey dwelling with integral garage

    Applied Sep 3, 2019 · issued Nov 29, 2019 · completed Jul 21, 2021 · Permit 19 215413 HVA

    Closed
  • Plumbing

    Plumbing - Demolish existing dwelling to construct new two storey dwelling with integral garage

    Applied Sep 3, 2019 · issued Nov 29, 2019 · completed Aug 5, 2021 · Permit 19 215413 PLB

    Closed
  • New house · New building

    Demolish existing dwelling to construct new two storey dwelling with integral garage

    Applied Sep 3, 2019 · issued Nov 29, 2019 · completed Aug 5, 2021 · 1 home added · Permit 19 215413 BLD

    Closed
  • Demolition

    To demolish existing dwelling and construct a new two storey dwelling with integral garage

    Applied Sep 3, 2019 · issued Nov 29, 2019 · completed Apr 30, 2021 · 1 home removed · Permit 19 215424 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new dwelling. Please note, this file was previously deferred on June 5th, 2019 in order to allow the applicant an opportunity to meet Building to discuss the missing variances and to meet with Forestry Department.

    Decision: Approved (hearing Jul 18, 2019)

    Filed Feb 13, 2019 · File A0106/19NY

    Closed
  • Minor variance · New R building

    To construct a new two-storey detached dwelling with an integral garage.

    Decision: Refused (hearing Mar 28, 2018)

    Filed Jun 8, 2017 · File A0650/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 589 Eglinton Ave E · Minor variance

    The proposal seeks approval for a 47 storey mixed-use residential building, refinements to the approved development concept, include an increase in height, adjustments to the tower massing, and design.

    160 m away · filed Jun 5, 2026 · Approved

  • 61 Banff Rd · Minor variance

    To alter the existing detached dwelling by constructing a ground floor addition and a second storey addition.

    230 m away · filed Sep 26, 2025 · Approved

  • 503 Eglinton Ave E · Minor variance

    To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 878-2024), whereby to modify the permitted minimum building setbacks and increase the number of storeys from the approved 14 to 15 (plus an amenity penthouse level), resulting in an increased total building height from 53.6 m to 54.8 m. Other related Planning Applications: 22 168175 NNY 15 OZ and 22 168174 NNY 15 SA

    140 m away · filed Jun 4, 2025 · Approved

  • 1710 Bayview Ave · Minor variance

    To alter the previously approved 9-storey mixed-use building, which is currently under construction. The variances are being requested to allow for a 0.3 metre increase in building height, to alter the permitted location of functional building elements on the roof and to reduce the supply of visitor parking. Cross-reference City of Toronto By-law No. 1184-2022 (Ontario Land Tribunal).

    170 m away · filed Jan 6, 2025 · Approved

  • 596 Soudan Ave · Minor variance

    To construct a new three-storey detached dwelling.

    120 m away · filed Oct 4, 2024 · Approved

  • 23 Hoyle Ave · Minor variance

    To construct a new duplex with an integral basement and garage. Also proposed is a front porch, rear balcony, rear deck and rear basement walkout. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 10, 2024.

    40 m away · filed Aug 22, 2024 · Approved

  • 67 Banff Rd · Minor variance

    To permit an accessory building (shed) in the rear of the subject property in conjunction with the removal of a parking space.

    230 m away · filed Mar 27, 2024 · Approved

  • 22 Mann Ave · Minor variance

    To permit a parking pad in the front yard of the subject property. Please note this application was previously deferred Thursday, February 1, 2024.

    80 m away · filed Nov 27, 2023 · Refused

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.