Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

315 Main St

Main Station

The City of Toronto has 14 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal to install Fall Prevention Railings and roof access.(TTC Main Subway Station)

    Applied Sep 4, 2026 · Permit 26 232491 BLD

    Under review
  • Addition or alteration · Interior alterations

    Replacement of pit hatch, installation of new pit ladder and local concrete slab repair at the station.

    Applied Nov 6, 2025 · issued Dec 11, 2025 · Permit 25 250341 BLD

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    Install three (3) backflow preventers for domestic and fire water services at Main St. Subway Station

    Applied Jun 23, 2021 · issued Jul 22, 2021 · completed Mar 5, 2026 · Permit 21 174628 PSA

    Closed
  • Plumbing

    Plumbing - Modification to existing HVAC equipment which includes electrical and mechanical upgrades inside Main Street Subway Station electrical rooms. Plumbing and mechanical work related to the installation of the air conditioners, including wall penetrations, drains and water lines

    Applied May 31, 2021 · issued Jun 30, 2021 · completed Aug 3, 2022 · Permit 21 163314 PLB

    Closed
  • Addition or alteration · Interior alterations

    Modification to existing HVAC equipment which includes electrical and mechanical upgrades inside Main Street Subway Station electrical rooms. Plumbing and mechanical work related to the installation of the air conditioners, including wall penetrations, drains and water lines

    Applied May 31, 2021 · issued Jun 29, 2021 · completed Nov 24, 2022 · Permit 21 163314 BLD

    Closed
  • Heating and ventilation

    HVAC - Modification to existing HVAC equipment which includes electrical and mechanical upgrades inside Main Street Subway Station electrical rooms. Plumbing and mechanical work related to the installation of the air conditioners, including wall penetrations, drains and water lines

    Applied May 31, 2021 · issued Jun 30, 2021 · completed Aug 29, 2022 · Permit 21 163314 HVA

    Closed
  • Addition or alteration · Other

    Proposal to repair existing concrete column and repair of structural pavement at existing transit station.

    Applied Sep 11, 2020 · issued Oct 20, 2020 · Permit 20 192512 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - TTC Subway Station

    Applied Dec 29, 2017 · issued Jan 29, 2018 · completed Oct 16, 2019 · Permit 17 280064 BLD

    Closed
  • Addition or alteration · Other

    Proposal for roof rehabilitation including 3 overhead support poles om roof structure and building egress capacity to facillitate construction work.

    Applied Nov 24, 2017 · issued Dec 22, 2017 · completed Mar 22, 2019 · Permit 17 267103 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for roof rehabilitation including 3 overhead support poles om roof structure and building egress capacity to facillitate construction work.

    Applied Nov 24, 2017 · issued Dec 22, 2017 · completed Mar 20, 2019 · Permit 17 267103 PLB

    Closed
  • Plumbing · Other

    Permit to replace (2) existing storm pumps at Main Station.

    Applied Dec 30, 2015 · issued Jan 27, 2016 · completed Jul 19, 2017 · Permit 15 270431 PSA

    Closed
  • Addition or alteration · Interior alterations

    Make interior alterations to existing retail area on concourse level for retail store purposes.

    Applied May 26, 2005 · issued Jun 20, 2005 · completed Jun 8, 2026 · Permit 05 136044 BLD

    Closed (dormant)
Show 2 more permits
  • Heating and ventilation

    Alterations to ventilation systems in construction affected areas as per b.p. # 01-153703.For plans see p. # 01-153703

    Applied Nov 15, 2001 · issued Mar 21, 2003 · completed Jun 8, 2026 · Permit 01 195105 HVA

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Construct elevator shaft between Eastbound subway platform level to street level and elevator shaft between westbound subway platform level and concourse level. Also make alterations to machine room on mezzanine level.

    Applied Jun 29, 2001 · issued Dec 11, 2002 · completed Jun 8, 2026 · Permit 01 153703 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 2575 Danforth Avenue

    55 storeys · 1,543 homes · Residential

    130 m away · Rezoning · Under appeal · filed Aug 26, 2022

    Under appeal
  • 276-294 Main Street

    Residential

    190 m away · Condominium · Approved · filed Mar 11, 2026

    Approved
  • 2681 Danforth Avenue

    48 storeys · 1,050 homes · Residential

    210 m away · Rezoning · Under appeal · filed Dec 21, 2022

    Under appeal
  • 2720-2734 Danforth Avenue

    8 storeys · 64 homes · Not stated in the file

    270 m away · Site plan · Under review · filed Mar 10, 2026

    Under review
  • 2721 Danforth Avenue

    55 storeys · 1,139 homes · Mixed use

    270 m away · Subdivision · Under appeal · filed Nov 7, 2021

    Under appeal
  • 6 Dawes Road

    37 storeys · 897 homes · Residential

    300 m away · Site plan · Approved · filed Apr 25, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 286 Main St · Minor variance

    To alter the development standards for a 27-storey mixed-use building (as approved under Site Specific Zoning By-law 265-2021(LPAT)) to permit the ground floor non-residential area to be converted into a childcare centre with south and west outdoor recreational areas. Also, three short-term parking spaces will be removed.

    180 m away · filed May 5, 2025 · Approved

  • 286 Main St · Minor variance

    To alter the development standards for a 27-storey mixed-use building (approved under Site Specific Zoning By-laws 266-2021(LPAT) and 265-2021(LPAT)) to permit non-residential uses (other than office space use) on the ground floor.

    180 m away · filed Jul 30, 2024 · Approved

  • 276 Main St · Minor variance

    To permit a reduced non-residential gross floor area (office or medical office) within the building.

    210 m away · filed Mar 14, 2023 · Approved

  • 347 Main St · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, front and rear second storey balconies, and a rear ground floor deck.

    110 m away · filed Mar 7, 2023 · Approved

  • 340 Main St · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway. The existing garage will be demolished.

    110 m away · filed May 31, 2022 · Refused

  • 165 Stephenson Ave · Minor variance

    To construct a new maintenance building.

    250 m away · filed Feb 8, 2021 · Approved

  • 68 Barrington Ave · Minor variance

    To construct a new detached garage to the rear of the existing two-storey detached house.

    190 m away · filed Jan 21, 2020 · Approved

  • 80 Barrington Ave · Minor variance

    To construct a new rear detached garage.

    240 m away · filed May 9, 2019 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.