Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

3180 Lake Shore Blvd W

The City of Toronto has 13 building permits since 2017 (10 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Special ventilation system

    New kitchen exhaust system in existing restaurant

    Applied Mar 19, 2025 · issued Apr 24, 2025 · Permit 25 131545 MSA

    Inspections under way
  • Designated structure · Sign building permit related

    1 Wall SIGN - H&R Block

    Applied Mar 5, 2025 · issued Mar 10, 2025 · completed Dec 8, 2025 · Permit 25 125076 DST

    Closed
  • Addition or alteration · Canopy w/o enclosure

    Proposal to install 5 awnings to an existing restaurant Popeyes (unit 8)

    Applied Feb 17, 2021 · issued Mar 24, 2021 · Permit 21 117399 BLD

    Permit issued
  • Plumbing

    REV - 01 MINOR REVISIONPlumbing - Proposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E, scope of work includes HVAC, New Kitchen Exhaust Hood and Plumbing.

    Applied Jan 27, 2021 · issued Mar 24, 2021 · Permit 20 198692 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    REV - 01 minor interior alterationsProposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E

    Applied Jan 27, 2021 · issued Mar 1, 2021 · Permit 20 198692 BLD (revision 01)

    Revision issued
  • Designated structure · Sign building permit related

    In conjunction with a single-storey building on the premises, proposal to erect and display 4 illuminated wall signs, displaying static copy at the 1st floor on the south and east elevations.****POPEYE'S****

    Applied Jan 7, 2021 · issued Feb 10, 2021 · completed Mar 16, 2022 · Permit 21 101495 DST

    Closed
  • Heating and ventilation

    REV #1-Different RTU to be used than originally specified. HVAC - Proposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E, scope of work includes HVAC, New Kitchen Exhaust Hood and Plumbing.

    Applied Nov 18, 2020 · issued Dec 11, 2020 · Permit 20 198692 HVA (revision 01)

    Revision issued
  • Plumbing

    Plumbing - 1-INTERIOR RENO TO COCO BUBBLE TEA-30 SEATS, 2-HVAC PLAN, 3-PLUMBING-ADD 14 FIXTURES

    Applied Oct 16, 2020 · issued Nov 16, 2020 · completed Mar 8, 2021 · Permit 20 207569 PLB

    Closed
  • Addition or alteration · Interior alterations

    1-interior reno to coco bubble tea-30 seats, 2-hvac plan, 3-plumbing-add 14 fixtures

    Applied Oct 16, 2020 · issued Nov 13, 2020 · Permit 20 207569 BLD

    Inspections under way
  • Heating and ventilation

    Hvac - 1-interior reno to coco bubble tea-30 seats, 2-hvac plan, 3-plumbing-add 14 fixtures

    Applied Oct 16, 2020 · issued Nov 16, 2020 · Permit 20 207569 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E

    Applied Sep 25, 2020 · issued Oct 20, 2020 · Permit 20 198692 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E, scope of work includes HVAC, New Kitchen Exhaust Hood and Plumbing.

    Applied Sep 25, 2020 · issued Oct 27, 2020 · Permit 20 198692 PLB

    Inspections under way
Show 1 more permit
  • Heating and ventilation

    HVAC - Proposal for tenant fit out of a new restaurant "Popeye's" in units 7, 7W & 7E, scope of work includes HVAC, New Kitchen Exhaust Hood and Plumbing.

    Applied Sep 25, 2020 · issued Oct 27, 2020 · Permit 20 198692 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 314 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    160 m away · filed Sep 5, 2023 · Approved

  • 5 Twenty Second St · Minor variance

    To construct a new garden suite in the rear yard.

    210 m away · filed Jul 20, 2023 · Approved

  • 32 Seventeenth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed May 19, 2023 · Approved

  • 30 Nineteenth St · Minor variance

    To construct a second storey addition above the existing dwelling and a new covered front porch.

    170 m away · filed Mar 29, 2023 · Approved

  • 33 Twenty First St · Minor variance

    To construct a second storey rear platform. A previous Committee of Adjustment application (A0916/17EYK) approved variances related to floor space index, side yard setback, parking space width, driveway width, dwelling height, front and rear exterior main wall height.

    180 m away · filed Aug 30, 2022 · Approved

  • 40 Twenty First St · Minor variance

    To construct a new detached dwelling. The existing detached garage in the rear yard will be maintained.

    230 m away · filed Aug 16, 2022 · Approved

  • 36 Seventeenth St · Minor variance

    To construct a second storey addition above the existing dwelling, a front porch and a rear yard deck.

    250 m away · filed Jan 18, 2022 · Approved

  • 44 Nineteenth St · Minor variance

    Proposed basement extension, addition on ground and 2nd floor at rear. Interior alterations.

    240 m away · filed Dec 29, 2021 · Application withdrawn

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.