Toronto address · Ward 3, Etobicoke-Lakeshore
32 Renown Rd
The City of Toronto has 6 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal to construct a two storey rear addition, new deck, walkout, and balcony
Applied Jan 24, 2018 · issued Jan 24, 2018 · Permit 17 200109 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a two storey rear addition, new deck, walkout, and balcony
Applied Jul 17, 2017 · issued Oct 3, 2017 · Permit 17 200109 BLD
- Closed
Small residential project · Pool fence enclosure
Proposal to construct a pool fence enclosure
Applied Apr 21, 2017 · issued May 16, 2017 · completed May 16, 2017 · Permit 17 147435 BLD
- Revision issued
Small residential project · Underpinning
Revised application to underpin existing porch-Proposal to underpin basement level within existing single detached dwelling.
Applied Dec 21, 2016 · issued Jan 18, 2017 · Permit 16 250750 BLD (revision 01)
- Revocation pending
Plumbing
Plumbing - Proposal to underpin basement level within existing single detached dwelling.
Applied Nov 14, 2016 · issued Nov 29, 2016 · Permit 16 250750 PLB
- Inspections under way
Small residential project · Underpinning
Proposal to underpin basement level within existing single detached dwelling.
Applied Nov 14, 2016 · issued Nov 29, 2016 · Permit 16 250750 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey rear addition, a second storey rear balcony, a rear covered deck, and a swimming pool in the rear yard.
Decision: Approved (hearing Apr 6, 2017)
Filed Feb 23, 2017 · File A0178/17EYK
What’s planned nearby
Development sites within 500 m
- Approved
5 storeys · 30 homes · Mixed use
120 m away · Site plan · Approved · filed Apr 28, 2021
- Under review
7 storeys · Residential
190 m away · Site plan · Under review · filed Dec 24, 2025
- Under review
- Under review
43 storeys · 198 homes · Residential
320 m away · Site plan · Under review · filed Jun 2, 2026
- Approved
44 storeys · 530 homes · Mixed use
360 m away · Site plan · Approved · filed Aug 19, 2025
- Approved
3825 Bloor Street West and 5230 Dundas Street West
36 storeys · 525 homes · Mixed use
380 m away · Site plan · Approved · filed Jul 4, 2024
Neighbours’ Committee of Adjustment files within 250 m
7 Summerland Ter · Consent
To obtain consent to create an easement/right-of-way for the purposes of parking, and vehicular and pedestrian access.
240 m away · filed Dec 19, 2025 · Approved
1006 Kipling Ave · Minor variance
To construct a new 6-storey apartment building that will contain a total of 46 residential units.
180 m away · filed Aug 7, 2025 · Approved
5134 Dundas St W · Minor variance
To construct a five-storey mixed-use building.
140 m away · filed Oct 29, 2024 · Approved
1012 Kipling Ave · Minor variance
210 m away · filed Jul 8, 2024 · Postponed
5 Streight Lane · Minor variance
To construct a deck in the rear yard.
80 m away · filed Jun 14, 2024 · Approved
17 Streight Lane · Minor variance
To construct a second storey rear platform.
60 m away · filed Jul 7, 2023 · Refused
5134 Dundas St W · Minor variance
To construct a new six-storey residential building and a six-storey mixed use building connected by a courtyard. A total of 28 dwelling units are proposed and two commercial units are proposed on the ground floor of the East Building.
140 m away · filed May 4, 2021 · Approved
27 Prennan Ave · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Apr 30, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.