Toronto address · Ward 13, Toronto Centre
325 Bleecker St
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Fire alarm
Proposal for fire alarm system renewal
Applied Aug 11, 2026 · issued Aug 24, 2026 · Permit 26 217485 FSU
- Permit issued
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Replace existing 6 DHW boilers.
Applied Nov 10, 2020 · issued Dec 3, 2020 · Permit 20 217118 MSA
- Closed
Fire and security upgrade · Electromagnetic locks
Install one maglock in basement level of existing apartment building.
Applied Mar 16, 2018 · issued Mar 20, 2018 · completed Jun 11, 2025 · Permit 18 130208 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
41 storeys · 460 homes · Mixed use
190 m away · Rezoning · Approved · filed Aug 25, 2025
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
200 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
566-576 Sherbourne Street and 29-37 Linden Street
69 storeys · 872 homes · Residential
210 m away · Site plan · Under review · filed Apr 27, 2023
- Under appeal
69 storeys · 823 homes · Residential
210 m away · Rezoning · Under appeal · filed Feb 26, 2024
- Under review
69 storeys · 770 homes · Residential
250 m away · Site plan · Under review · filed Jun 21, 2023
- Under review
2-8 Earl Street and 5 Huntley Street
63 storeys · Residential
280 m away · Site plan · Under review · filed Sep 23, 2024
Neighbours’ Committee of Adjustment files within 250 m
576 Sherbourne St · Minor variance
200 m away · filed Apr 22, 2026 · Postponed
591 Sherbourne St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.
210 m away · filed Jun 30, 2025 · Approved
601 Sherbourne St · Minor variance
To facilitate the redevelopment of this site for a 51-storey mixed-use building, including the Parkland dedication requirement. This application is necessitated to modify Sections 4, 7, 16, and 24 under Appendix 1, Site Specific Zoning By-law 1528-2019, and Sections 4, 7, 15, and 23 under Schedule A, Site Specific Zoning By-law 1529-2019, which relates to the timing of conveyance and lease of the parklands and the construction for park improvements.
230 m away · filed Apr 17, 2025 · Approved
545-565 Sherbourne St · Consent
To obtain consent to sever a portion of land for the purpose of a lot addition.
60 m away · filed May 2, 2023 · Approved
50 Earl St · Minor variance
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
120 m away · filed Apr 24, 2021 · Approved
50 Earl St · Minor variance
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
120 m away · filed Jun 8, 2020 · Approved
2 Glen Rd · Minor variance
To legalize and maintain a three-storey residential apartment building with a reconstructed front porch and canopy.
240 m away · filed Jun 3, 2019 · Approved
24 Howard St · Minor variance
To maintain the designated three-storey converted house with 4 dwelling units on the conveyed lot as described in Consent Application B0070/15TEY.
230 m away · filed Aug 27, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.