Toronto address · Ward 15, Don Valley West
328 Broadway Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposed interior alterations to existing sfd to include installation of front awning, new rear door opening, new mtl beam in basement, new pantry room, and basement layout alterations.
Applied Oct 28, 2022 · issued Oct 28, 2022 · completed Apr 18, 2023 · Permit 22 188379 PLB
- Closed
Small residential project · Interior alterations
Revision 01 - Interior Alterations- Open Concept; -Front Awning; -Rear 1st floor Window Replacement with Doors; -Make Existing Kitchen beam flush, proposed steel; - Propoosed Pantry Room -Basement Alterations; Proposed interior alterations to existing sfd to include installation of front awning, new rear door opening, new mtl beam in basement, new pantry room, and basement layout alterations.
Applied Oct 28, 2022 · issued Nov 4, 2022 · completed Apr 14, 2025 · Permit 22 188379 BLD (revision 01)
- Closed
Small residential project · Interior alterations
Proposed interior alterations to existing sfd to include installation of front awning, new rear door opening, new mtl beam in basement, new pantry room, and basement layout alterations.
Applied Aug 9, 2022 · issued Sep 9, 2022 · completed Apr 14, 2025 · Permit 22 188379 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under appeal
544-552 Eglinton Avenue East and 12-14 Bruce Park Avenue
25 storeys · 256 homes · Mixed use
360 m away · Rezoning · Under appeal · filed Jul 23, 2025
- Approved
32 storeys · 8 homes · Residential
390 m away · Rezoning · Approved · filed Jun 13, 2024
- Under review
32 storeys · 249 homes · Mixed use
390 m away · Site plan · Under review · filed Nov 12, 2021
- Under review
39 storeys · 398 homes · Residential
410 m away · Site plan · Under review · filed Sep 4, 2024
- Under appeal
15 storeys · Residential
410 m away · Rezoning · Under appeal · filed Feb 6, 2025
Neighbours’ Committee of Adjustment files within 250 m
44 Fairfield Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck.
230 m away · filed Jul 28, 2026 · Approved
45 McBain Ave · Minor variance
To construct an in-ground pool in the rear yard and an equipment storage in the side yard.
220 m away · filed May 8, 2025 · Approved
50 Cardiff Rd · Minor variance
To construct a new dwelling.
120 m away · filed Apr 29, 2025 · Approved
51 McBain Ave · Minor variance
To construct a new dwelling.
230 m away · filed Nov 4, 2024 · Approved
157 Banff Rd · Minor variance
Proposal for rear addition and remove rear detached garage and replace with parking pad.
150 m away · filed Jul 13, 2023 · Approved
45 McBain Ave · Minor variance
To construct a new detached dwelling. Please note, the file was previously deferred on August 10, 2023, to allow the applicant to revise the application.
220 m away · filed May 5, 2023 · Approved
353 Broadway Ave · Minor variance
Proposal to revise the deck size for the under construction single family dwelling
180 m away · filed Mar 31, 2023 · Approved
12 McBain Ave · Minor variance
Proposal to construct a rear yard deck
190 m away · filed May 31, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.