Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

328 Palmerston Blvd

The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposed rear two storey addition, rear third storey addition with interior alterations for a two unit dwelling, underpinning, third storey deck and ground floor deck.

    Applied Jan 4, 2024 · issued Feb 9, 2024 · Permit 24 101070 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed rear two storey addition, rear third storey addition with interior alterations for a two unit dwelling, underpinning, third storey deck and ground floor deck.

    Applied Jan 4, 2024 · issued Feb 9, 2024 · completed Feb 4, 2026 · Permit 24 101070 HVA

    Closed
  • Plumbing

    Plumbing - Proposed rear two storey addition, rear third storey addition with interior alterations for a two unit dwelling, underpinning, third storey deck and ground floor deck.

    Applied Jan 4, 2024 · issued Feb 9, 2024 · completed Mar 9, 2026 · Permit 24 101070 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear ground floor deck with stairs, a rear second storey addition, and a partial rear third storey addition with a rooftop deck. Also, to rebuild the rear three-storey additions, and north side second and third storey bay windows. The basement will be converted into a secondary suite.

    Decision: Approved (hearing Sep 20, 2023)

    Filed Aug 2, 2023 · File A0680/23TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 452 Bathurst Street

    6 storeys · 49 homes · Mixed use

    300 m away · Site plan · Under review · filed Oct 15, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 390 Markham St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey sunroom addition. The existing rear one-storey partial addition will be demolished.

    190 m away · filed Aug 17, 2026 · Hearing scheduled

  • 439 Manning Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.

    230 m away · filed Jul 27, 2026 · Hearing scheduled

  • 409 Manning Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (abutting the laneway) by constructing a complete second storey addition with two front juliet balconies. The second storey will be cantilevered at the west side of the building. This ancillary building will contain storage/recreation area on a portion of the first level, and one laneway suite which will occupy a portion of the first level and the entire second storey. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

    170 m away · filed May 5, 2026 · Approved

  • 519 Euclid Ave · Minor variance

    To legalize and to maintain the rear ground floor deck with stairs that was constructed without an authorized building permit.

    240 m away · filed May 4, 2026 · Postponed

  • 338 Markham St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a rear ground floor deck, and a rear second storey deck. There will be a total of two residential dwelling units within this dwelling (one primary unit and one secondary suite within the rear portion of the second and third storeys of the dwelling).

    110 m away · filed Jan 8, 2026 · Postponed

  • 366 Palmerston Blvd · Minor variance

    To construct a new two-and-one-and-half-storey detached dwelling with a covered front porch with stairs, a front two-storey bay window, a front second storey terrace, a rear ground floor covered (canopy) deck, and a parking space on the side (south) of the lot. Also, to construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting the side (south) of the lot and the rear laneway.

    150 m away · filed Nov 19, 2025 · Approved

  • 364 Palmerston Blvd · Minor variance

    To alter the existing three-storey dwelling by constructing a two-storey rear addition with a rear ground floor deck with stairs.

    140 m away · filed Sep 22, 2025 · Approved

  • 325 Markham St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear two-storey addition, a reconstructed covered front porch with stairs, a front second floor balcony (above the front porch), an enlarged rear third floor rooftop deck (above the rear second floor addition), and a rear ground floor deck with stairs. Also, to construct a new detached two-storey ancillary building (containing a one-car garage on the main level, and one laneway suite on the second level), abutting the laneway. There will be a total of two residential dwelling units on this lot (one dwelling…

    150 m away · filed Sep 15, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.