Toronto address · Ward 13, Toronto Centre
33 Charles St E
The City of Toronto has 12 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal for replacement of fireplace and feature wall at 5th floor terrace, including localized replacement of existing gas connections, moisture protection system, and localized structural concrete repairs.
Applied Feb 27, 2025 · issued Apr 1, 2025 · Permit 25 122753 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for replacement of fireplace and feature wall at 5th floor terrace, including localized replacement of existing gas connections, moisture protection system, and localized structural concrete repairs.
Applied Feb 27, 2025 · issued Mar 27, 2025 · completed Aug 14, 2025 · Permit 25 122753 BLD
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for waterproofing and localized concrete repairs to the underground parking garage of an existing apartment building.
Applied Dec 2, 2024 · issued Dec 30, 2024 · completed Aug 14, 2025 · Permit 24 245720 BLD
- Closed
Addition or alteration · Garage Repair/Reconstruction
Localized repairs of concrete, thermal and moisture protection system, and working on the area drains existing within the building's parking garage, replacing them one for one to match the existing as they are currently either broken or leaking
Applied Feb 8, 2024 · issued Apr 26, 2024 · completed Aug 2, 2024 · Permit 24 113179 BLD
- Closed
Plumbing
Revsion - see BLD -2 revision for description & drawings.
Applied Sep 4, 2009 · issued Oct 20, 2009 · completed Jul 23, 2026 · Permit 06 159208 PLB (revision 02)
- Revision issued
Heating and ventilation
Revsion - see BLD -2 revision for description & drawings.
Applied Sep 4, 2009 · issued Oct 20, 2009 · Permit 06 159208 HVA (revision 02)
- Revision issued
Heating and ventilation
REVISION TO EXISTING HVAC PERMIT DUE TO REVISIONS IN BUILDING PERMITHVAC - Construct new 46-storey plus mechanical condominium building with 402 dwelling units, and 4 levels of below grade parking.
Applied Jun 8, 2009 · issued Jul 16, 2009 · Permit 06 159208 HVA (revision 01)
- Closed
Plumbing
REVISION TO EXISTING PLUMBING PERMIT - CHANGES DUE TO REVISIONS TO BUILDING PERMITS. FOR PLANS SEE HVAC FILEPlumbing - Construct new 46-storey plus mechanical condominium building with 402 dwelling units, and 4 levels of below grade parking.
Applied Jun 8, 2009 · issued Jul 16, 2009 · completed Jul 23, 2026 · Permit 06 159208 PLB (revision 01)
- Cancelled
Fire and security upgrade · Sprinklers
sprinkler permit for new apartment building see 06 159208 BLD for fees
Applied May 1, 2009 · completed Mar 20, 2019 · Permit 09 132873 FSU
- Inspections under way
Heating and ventilation
HVAC - Construct new 46-storey plus mechanical condominium building with 402 dwelling units, and 4 levels of below grade parking.
Applied May 22, 2008 · issued Oct 31, 2008 · Permit 06 159208 HVA
- Closed
Plumbing
Plumbing - Construct new 46-storey plus mechanical condominium building with 402 dwelling units, and 4 levels of below grade parking.
Applied May 22, 2008 · issued Oct 31, 2008 · completed Jul 23, 2026 · Permit 06 159208 PLB
- Closed
Drains and site services
Drain - Construct new 46-storey plus mechanical condominium building with 402 dwelling units, and 4 levels of below grade parking.
Applied May 22, 2008 · issued Jun 4, 2008 · completed Jul 23, 2026 · Permit 06 159208 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
69 storeys · 814 homes · Residential
60 m away · Rezoning · Under review · filed Jun 23, 2025
- Under review
15 Charles Street East and 16 Isabella Street
66 storeys · 610 homes · Mixed use
110 m away · Site plan · Under review · filed Dec 24, 2021
- Under review
11 storeys · 16 homes · Residential
120 m away · Site plan · Under review · filed Jul 5, 2024
- Under review
75 storeys · 843 homes · Mixed use
130 m away · Rezoning · Under review · filed Mar 17, 2026
- Under review
76 storeys · 678 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 15, 2022
- Under review
619-637 Yonge Street and 1-9 Isabella Street
57 storeys · 606 homes · Mixed use
170 m away · Site plan · Under review · filed Apr 11, 2022
Neighbours’ Committee of Adjustment files within 250 m
7 Charles St W · Consent
To obtain consent for a technical severance to re-establish the lots which merged on title.
190 m away · filed Nov 5, 2024 · Approved
680 Yonge St · Minor variance
To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.
190 m away · filed Aug 23, 2024 · Approved
7 Gloucester St · Consent
To obtain consent to sever the property into two residential lots. The existing easements/rights-of-way will be maintained and unaltered. The existing 44-storey mixed-use building (also on the lot) will be maintained and unaltered. This building is under a condo ownership and requires a variance to the Zoning By-law as outlined in Minor Variance Application A0653/24TEY.
240 m away · filed Jul 23, 2024 · Approved
11 Gloucester St · Minor variance
To convert the existing two-and-one-half-storey townhouse into a mixed-use building.
230 m away · filed Jul 23, 2024 · Approved
30 Charles St E · Minor variance
To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.
80 m away · filed Jun 2, 2024 · Refused
62 Charles St E · Minor variance
To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.
120 m away · filed Jan 12, 2024 · Approved
66 Charles St E · Minor variance
To convert the existing two-and-one-half-storey detached residential (heritage) building into an apartment building by maintaining only the front portion of the existing building and constructing a 9-storey rear addition (and one mechanical penthouse level). Also, to construct a front ground floor porch and stairs, a front basement walkout, rear balconies on the second to fourth storeys, a front deck on the fourth storey, as well as front and rear balconies on the fifth to nineth storeys. There will be a total of 16 dwelling units within this apartment building.
130 m away · filed Sep 6, 2023 · Approved
55 Charles St E · Consent
To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.
70 m away · filed Aug 31, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.