Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

7 Charles St W

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent for a technical severance to re-establish the lots which merged on title.

    Decision: Approved (hearing Apr 9, 2025)

    Filed Nov 5, 2024 · File B0072/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 25 St Mary St · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 596-2023, for the existing 24-storey mixed-use building to modify the building setbacks and to reduce the indoor amenity provisions. This is currently under the review of Site Plan Control (File No. 21 166615 STE 13 SA). There will be a total of 1,024 residential dwelling units on this lot with retail and a daycare facility on the ground floor.

    140 m away · filed Jan 20, 2026 · Application withdrawn

  • 680 Yonge St · Minor variance

    To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.

    140 m away · filed Aug 23, 2024 · Approved

  • 30 Charles St E · Minor variance

    To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.

    170 m away · filed Jun 2, 2024 · Refused

  • 1099 Bay St · Minor variance

    To alter the existing 27-storey mixed-use building by constructing a storage area on Level P4 (to replace an existing non-conforming storage area on Level P5), and to permit a reduction in the number of parking spaces for residents from 127 spaces to 112 spaces. The 15 existing parking spaces for visitors will be maintained and unaltered. Also, to permit a reduction to the required length of 25 existing parking spaces.

    160 m away · filed Jan 24, 2024 · Withdrawn

  • 2 Gloucester St · Minor variance

    To alter the existing one-storey rooftop structure of Suite 406, by constructing a one-storey rooftop extension with a rooftop deck.

    240 m away · filed Dec 9, 2022 · Approved

  • 10 St Mary St · Minor variance

    To alter the development to increase the height of the approved 51-storey mixed-use building (located on the west side of the site, abutting St. Nicholas Street) as shown on Revised Diagram 3 and to alter the building setback, encroachment and projection of elements of the building including terraces and balconies, as shown on Revised Diagram 3. Also, to increase the residential gross floor area, number of dwelling units (no maximum number of dwelling units), number of vehicle access locations, alter loading space provisions and to reduce the number of automobile parking spaces and size of ob…

    60 m away · filed Sep 23, 2022 · Approved

  • 63 St Nicholas St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.

    140 m away · filed Sep 14, 2022 · Approved

  • 19 Bloor St W · Minor variance

    To alter the existing two-storey commercial building by constructing a side addition and to perform interior alterations to convert the western portion of the building from office use to retail use.

    170 m away · filed May 15, 2021 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.