Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

33 Dupont St

The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior alterations to basement, underpinning and construct rear walk-out. Basement to be used in conjunction with 1st floor as 1 dwelling unit. Note: basement not to be used as a separate dwelling unit.

    Applied May 13, 2019 · issued May 16, 2019 · Permit 05 108099 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Revision 01 - Interior alterations to basement, ground and second and add basement walkout. Existing 2 unit dwelling to be converting to 3 unit dwelling (basement - unit 1, main - unit 2, second/third - unit 3)Interior alterations to basement, underpinning and construct rear walk-out. Basement to be used in conjunction with 1st floor as 1 dwelling unit. Note: basement not to be used as a separate dwelling unit.

    Applied Apr 2, 2019 · issued May 27, 2019 · 1 home added · Permit 05 108099 BLD (revision 01)

    Revision issued
  • Drains and site services

    Drain - sump pump and backwater valveInterior alterations to basement, underpinning and construct rear walk-out. Basement to be used in conjunction with 1st floor as 1 dwelling unit. Note: basement not to be used as a separate dwelling unit.

    Applied Mar 25, 2019 · issued Mar 26, 2019 · Permit 05 108099 DRN

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to basement, underpinning and construct rear walk-out. Basement to be used in conjunction with 1st floor as 1 dwelling unit. Note: basement not to be used as a separate dwelling unit.

    Applied Mar 25, 2019 · issued Mar 25, 2019 · Permit 05 108099 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Interior alterations to basement and construct basement walk-out at rear

    Applied Feb 10, 2005 · Permit 05 108096 BLD

    Under review
  • Small residential project · Multiple projects

    Interior alterations to basement, underpinning and construct rear walk-out. Basement to be used in conjunction with 1st floor as 1 dwelling unit. Note: basement not to be used as a separate dwelling unit.

    Applied Feb 10, 2005 · issued Feb 28, 2005 · Permit 05 108099 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 250 Davenport Rd · Minor variance

    230 m away · filed Aug 20, 2026 · Postponed

  • 14 Dupont St · Minor variance

    To convert the existing two-and-one-half-storey non-residential (commercial) building into a mixed-use building by constructing complete fourth and fifth storey (mechanical penthouse) additions, and a front second storey terrace. Also, to construct a rear three-storey addition (including a basement) with third and fourth storey terraces, and a rear fifth storey rooftop terrace (including a green roof). The existing restaurant will continue to occupy the basement and ground floor levels (including the existing front outdoor patio and a new outdoor patio addition along the east side of the lot)…

    60 m away · filed May 11, 2026 · Approved

  • 21 Dupont St · Minor variance

    To permit and to maintain the existing conversion of the rear two-car integral garage of the existing two-and-one-half-storey semi-detached dwelling into a one-car garage with a separate habitable space (kitchen extension). Also, to permit and to maintain the existing rear ground floor covered (awning) deck with stairs and the rear ancillary building (shed). Also, to reconstruct the existing rear second storey roof deck above the garage and the existing third storey roof deck.

    20 m away · filed Dec 3, 2025 · Approved

  • 12 Mc Master Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a rear third storey addition (one dormer above the two-storey addition), and a rear ground floor deck with stairs (the existing rear ground floor deck will be demolished).

    240 m away · filed Oct 3, 2025 · Approved

  • 247 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    140 m away · filed Oct 1, 2025 · Approved

  • 249 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    130 m away · filed Oct 1, 2025 · Approved

  • 115 Dupont St · Minor variance

    To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).

    240 m away · filed Sep 24, 2025 · Postponed

  • 284 Avenue Rd · Minor variance

    To convert the existing three-storey semi-detached mixed-use building (containing one residential dwelling unit and one commercial unit) into a triplex (containing three residential dwelling units) by installing a new basement dwelling unit.

    220 m away · filed Feb 7, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.