Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

33 Northridge Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a backwater valve

    Applied May 16, 2024 · issued May 16, 2024 · completed May 27, 2024 · Permit 24 149975 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 49 Derwyn Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a front covered porch with stairs, and a rear first level deck with stairs. Also, to construct a new one-storey ancillary building (one-car garage), in the rear yard of the property. The existing garage will be demolished.

    130 m away · filed Apr 27, 2026 · Approved

  • 161 Durant Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey side (south) addition and a complete second storey addition. The existing rear sunroom addition will be demolished and replaced with a walkout basement staircase and a deck.

    190 m away · filed Nov 4, 2024 · Approved

  • 15 Derwyn Rd · Minor variance

    To alter the existing one-storey detached dwelling (approved under Building Permit No. 20 23 1408363 BLD) by constructing a front covered porch, a complete second storey addition, and a rear two-storey addition with a ground floor deck. There will be one primary unit and one secondary suite (located within the basement) on this lot.

    130 m away · filed Oct 15, 2024 · Approved

  • 80 Lankin Blvd · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting Plains Road.

    230 m away · filed Oct 8, 2024 · Approved

  • 167 Durant Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (sunroom), and a rear ground floor deck with stairs. Also, the front portion of the existing one-storey ancillary building (detached garage in the rear yard) will be demolished. This reduced one-car garage will be maintained on-site.

    190 m away · filed May 3, 2024 · Approved

  • 24 Northridge Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a new front covered porch with stairs, a front basement walkout, and a rear ground floor covered deck with stairs.

    60 m away · filed Jan 12, 2024 · Approved

  • 312 Linsmore Cres · Minor variance

    To construct a new two-storey detached dwelling with two covered porches (one fronting Plains Road and one fronting Linsmore Crescent), a south side deck with stairs, and a integral garage (abutting Plains Road).

    230 m away · filed Nov 2, 2023 · Approved

  • 171 Durant Ave · Minor variance

    To construct a new two-storey detached dwelling with a covered front porch with stairs, rear ground floor deck with stairs, rear second floor balcony, and a rear basement walkout. Also, to alter the existing one-storey ancillary building (garage) in the rear yard by converting it into a two-storey garden suite, with a cantilevered second storey and a front (south) second floor balcony.

    190 m away · filed Feb 3, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.