Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

330 Jarvis St

The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    Applied Aug 6, 2026 · Permit 26 214909 BLD

    Under review
  • Heating and ventilation

    HVAC - Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    Applied Aug 6, 2026 · Permit 26 214909 HVA

    Examiner's notice sent
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to replace existing chiller unit with a new chiller unit.

    Applied Oct 17, 2017 · issued Nov 15, 2017 · Permit 17 249171 MSA

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device in an existing apartment building.

    Applied Sep 13, 2011 · issued Sep 26, 2011 · completed Jun 1, 2026 · Permit 11 273572 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 296 Jarvis St · Minor variance

    To alter the existing 18-storey mixed-use building (as approved under Site Specific Zoning By-law 298-88) by converting the existing service and retail office floor area on the first storey, and the hotel conference and banquet room floor areas on the second storey into a hotel with 50 guest suites. The existing second storey bridge connecting to 300 Jarvis Street will be demolished..

    190 m away · filed Jul 22, 2025 · Postponed

  • 97 Granby St · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    190 m away · filed Jun 18, 2025 · Approved

  • 134 Carlton St · Minor variance

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    140 m away · filed May 13, 2025 · Approved

  • 130 Carlton St · Minor variance

    To permit the reconstruction of the mezzanine in the residential dwelling unit (Penthouse #8), of the 15-storey residential building.

    70 m away · filed Dec 12, 2024 · Approved

  • 111 Carlton St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements.

    60 m away · filed Mar 12, 2024 · Approved

  • 130 Carlton St · Minor variance

    To alter the existing 15-storey mixed-use building by constructing a new main entrance vestibule.

    70 m away · filed Apr 26, 2022 · Approved

  • 109 1/2 Granby St · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    160 m away · filed Dec 7, 2021 · Approved

  • 344 Jarvis St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    50 m away · filed Sep 14, 2021 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.