Toronto address · Ward 19, Beaches-East York
34 Halsey Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Multiple projects
Interior alteration to existing house for secondary dweling in the basement. New rear side deck and changes to front porch.
Applied Aug 18, 2025 · issued Sep 1, 2026 · 1 home added · Permit 25 212225 BLD
- Permit issued
Plumbing
Plumbing - Proposal for interior altertions to convert to a 3 unit dwelling.
Applied Aug 18, 2025 · issued Sep 1, 2026 · Permit 25 212225 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
6 Park Vista · Minor variance
To alter the existing 10-storey apartment building by converting the second floor laundry room, the third floor storage room and locker rooms on the fourth through ninth floors (all located on the south side of the building) into eight residential dwelling units. Also, to convert the ground floor storage and mechanical room (located on the south side of the building) into a laundry room with amenity space (meeting room/lounge) and a maintenance area. Also, the southeast portion of the ground floor lobby will be converted into an additional amenity space (meeting room/lounge). There will be fi…
240 m away · filed Feb 17, 2026 · Deferred
2 Park Vista · Minor variance
To alter the existing 11-storey residential apartment building by converting the second floor laundry room as well as the locker rooms on the fourth to tenth storeys into eight bachelor units. The existing storage rooms on the ground floor will be converted into laundry room and locker rooms. There will be a total of 129 residential dwelling units on this lot.
110 m away · filed Apr 2, 2025 · Approved
21 Elmont Dr · Minor variance
To construct a new two-storey detached dwelling, with a front covered porch, an integral garage, a rear covered patio, and a basement walkout. The existing front yard parking space will be maintained.
220 m away · filed Jan 17, 2023 · Approved
80 Halsey Ave · Minor variance
To alter the existing two-storey townhouse dwelling by converting the garage space into a secondary suite (located in the basement and on the ground floor). Also, the existing driveway will be used for one parking space.
230 m away · filed Apr 29, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.