Toronto address · Ward 11, University-Rosedale
346 Davenport Rd
The City of Toronto has 12 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to add mag lock on ground floor exterior door
Applied Sep 12, 2024 · issued Sep 16, 2024 · completed Jan 9, 2025 · Permit 24 212138 FSU
- Permit issued
Drains and site services · Inside and outside drains
Drain - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Sep 18, 2020 · issued Dec 31, 2021 · Permit 18 215782 STS
- Inspections under way
Drains and site services
Drain - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Sep 18, 2020 · issued Nov 27, 2020 · Permit 18 215782 DRN
- Cancelled
Conditional permit · Partial permit - shoring
Conditional Permit - Part Permit - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Nov 29, 2019 · issued Jan 8, 2020 · completed Nov 27, 2020 · Permit 18 215782 SHO
- Cancelled
Partial permit · Partial permit - foundation
Part Permit - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Oct 7, 2019 · issued Nov 27, 2020 · completed Jul 5, 2021 · Permit 18 215782 FND
- Cancelled
Partial permit · Partial permit - structural framing
Part Permit - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Oct 7, 2019 · issued Jul 5, 2021 · completed Jul 9, 2021 · Permit 18 215782 STR
- Approved
Alternative solution
Proposed alternative solution to omit the installation of Fire Hose Cabinets within the building.
Applied Aug 27, 2018 · completed Aug 31, 2021 · Permit 18 215775 ALT
- Inspections under way
Plumbing
Plumbing - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Aug 27, 2018 · issued Feb 1, 2021 · Permit 18 215782 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Aug 27, 2018 · issued Feb 1, 2021 · Permit 18 215782 HVA
- Inspections under way
New building
Proposed construction of a new 9-storey, 30 unit residential condominium with 1 retail space at grade and 3 levels of below grade parking.
Applied Aug 27, 2018 · issued Jul 9, 2021 · 30 homes added · Permit 18 215782 BLD
- Closed
Demolition
Proposal for demolition a 2 1/2 storey mixed use building and a glass / steel single storey sales centre in the rear yards of 346, 344, and 342 Davenport Rd built under permit 15-195658
Applied Sep 25, 2017 · issued May 11, 2018 · completed Apr 21, 2020 · 1 home removed · Permit 17 238306 DEM
- Inspections under way
Addition or alteration · Multiple projects
Proposal for interior alterations to ground floor office space and a new one storey rear addition see related permit admin permits on 344 and 342 Davenport
Applied Jul 23, 2015 · issued Oct 16, 2015 · Permit 15 195658 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 23 homes · Residential
90 m away · Condominium · Under review · filed Oct 28, 2021
- Approved
141-145 Bedford Road and 287 Davenport Road
13 storeys · 63 homes · Mixed use
210 m away · Site plan · Approved · filed Dec 14, 2021
- Approved
- Under appeal
18 storeys · 121 homes · Residential
270 m away · Rezoning · Under appeal · filed Jan 8, 2025
- Under review
220-234 Davenport Road and 148-158 Avenue Road
38 storeys · 110 homes · Mixed use
340 m away · Site plan · Under review · filed Jul 2, 2021
- Under review
183-189 Avenue Road and 109-111 Pears Avenue
11 storeys · 18 homes · Mixed use
380 m away · Site plan · Under review · filed Oct 25, 2021
Neighbours’ Committee of Adjustment files within 250 m
247 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
140 m away · filed Oct 1, 2025 · Approved
249 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
150 m away · filed Oct 1, 2025 · Approved
115 Dupont St · Minor variance
To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).
50 m away · filed Sep 24, 2025 · Postponed
287 Davenport Rd · Minor variance
To alter the development standards for a 13-storey mixed-use building (as approved under Site Specific Zoning By-law 314-2023), by increasing the total non-residential gross floor area on the lot. A Site Plan Control application (File Number 21 248545 STE 11 SA) is currently under review.
200 m away · filed Aug 28, 2025 · Approved
312 St George St · Minor variance
To convert the existing three-storey semi-detached dwelling into a multi-tenant house containing 12 dwelling rooms. Also, to construct a rear third storey terrace, a rear three-storey exit staircase, and a rear basement walkout.
190 m away · filed Feb 21, 2025 · Refused
60 Bernard Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor addition with a terrace above.
210 m away · filed May 2, 2024 · Approved
115 Dupont St · Minor variance
To alter the five-storey office building, abutting the laneway, approved in OMB Decision MM160069 (Case No. PL170944) by reducing the height of the first storey.
50 m away · filed Sep 12, 2023 · Approved
372 Davenport Rd · Minor variance
To alter the existing two-storey fourplex detached dwelling by permitting an additional basement suite (for a total of five residential units). Also, to construct a front basement walkout staircase.
250 m away · filed Dec 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.