Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

60 Bernard Ave

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for addition and interior alteration to the existing single family dwelling

    Applied Oct 11, 2024 · issued Oct 28, 2024 · Permit 24 225397 PLB

    Permit issued
  • Small residential project · Multiple projects

    Proposal for addition and interior alteration to the existing single family dwelling

    Applied Oct 11, 2024 · issued Oct 28, 2024 · Permit 24 225397 BLD

    Permit issued
  • Drains and site services · Inside and outside drains

    New connection to Stormwater Drain to alleviate issues of flooding from runoff due to neighbour's hardscaping.

    Applied Jul 27, 2023 · issued Aug 22, 2023 · Permit 23 180443 STS

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor addition with a terrace above.

    Decision: Approved (hearing Jul 31, 2024)

    Filed May 2, 2024 · File A0413/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 250 Davenport Rd · Minor variance

    220 m away · filed Aug 20, 2026 · Postponed

  • 32 Tranby Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (enclose a portion of the existing rear third storey rooftop deck into habitable space).

    240 m away · filed Jun 2, 2026 · Approved

  • 17 Bernard Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition in front of the existing garage. Thise altered ancillary building will contain two tandem parking spaces.

    250 m away · filed Mar 5, 2026 · Approved

  • 115 Dupont St · Minor variance

    To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).

    250 m away · filed Sep 24, 2025 · Postponed

  • 287 Davenport Rd · Minor variance

    To alter the development standards for a 13-storey mixed-use building (as approved under Site Specific Zoning By-law 314-2023), by increasing the total non-residential gross floor area on the lot. A Site Plan Control application (File Number 21 248545 STE 11 SA) is currently under review.

    100 m away · filed Aug 28, 2025 · Approved

  • 124 Bedford Rd · Minor variance

    To alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition to contain one garden suite. The two-car integral parking spaces will be maintained and unaltered.

    120 m away · filed Dec 1, 2023 · Refused

  • 115 Dupont St · Minor variance

    To alter the five-storey office building, abutting the laneway, approved in OMB Decision MM160069 (Case No. PL170944) by reducing the height of the first storey.

    250 m away · filed Sep 12, 2023 · Approved

  • 48 Admiral Rd · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a front third storey addition (dormer), a rear two-storey addition with a covered ground floor deck and a basement walkout, and a rear third storey addition with a balcony.

    170 m away · filed Jan 20, 2023 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.