Toronto address · Ward 19, Beaches-East York
35 Halsey Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Second suite (New)
Proposal for new basement secondary suite
Applied Dec 31, 2025 · completed Jan 5, 2026 · 1 home added · Permit 25 271060 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
6 Park Vista · Minor variance
To alter the existing 10-storey apartment building by converting the second floor laundry room, the third floor storage room and locker rooms on the fourth through ninth floors (all located on the south side of the building) into eight residential dwelling units. Also, to convert the ground floor storage and mechanical room (located on the south side of the building) into a laundry room with amenity space (meeting room/lounge) and a maintenance area. Also, the southeast portion of the ground floor lobby will be converted into an additional amenity space (meeting room/lounge). There will be fi…
210 m away · filed Feb 17, 2026 · Deferred
7 Park Vista · Minor variance
To alter the existing 8-storey residential apartment building by converting the laundry and storage rooms (located on the second, third, fifth, sixth, seventh, and eighth levels) into 2 bachelor units and 4 one-bedroom units (for a total of 6 new residential dwelling units). There will be a total of 91 residential dwelling units on this lot.
240 m away · filed Jul 15, 2025 · Approved
2 Park Vista · Minor variance
To alter the existing 11-storey residential apartment building by converting the second floor laundry room as well as the locker rooms on the fourth to tenth storeys into eight bachelor units. The existing storage rooms on the ground floor will be converted into laundry room and locker rooms. There will be a total of 129 residential dwelling units on this lot.
60 m away · filed Apr 2, 2025 · Approved
80 Halsey Ave · Minor variance
To alter the existing two-storey townhouse dwelling by converting the garage space into a secondary suite (located in the basement and on the ground floor). Also, the existing driveway will be used for one parking space.
230 m away · filed Apr 29, 2022 · Approved
7 Park Vista · Minor variance
To alter the existing seven-storey, 84-unit apartment building by converting the fourth storey storage room into a one-bedroom unit.
240 m away · filed Aug 3, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.