Toronto address · Ward 8, Eglinton-Lawrence
35 Sandringham Dr
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Pool fence enclosure
Proposal to install a pool fence enclosure 48" height
Applied Nov 6, 2018 · issued Nov 20, 2018 · completed Nov 20, 2018 · Permit 18 253056 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a detached cabana at rear of SFD. See ZZC and COA.
Applied Sep 13, 2018 · issued Oct 1, 2018 · completed Nov 12, 2019 · Permit 18 225127 PLB
- Closed
Small residential project · Accessory Building(s)
Proposal to construct a detached cabana at rear of SFD. See ZZC and COA.
Applied Sep 13, 2018 · issued Oct 1, 2018 · completed Nov 12, 2019 · Permit 18 225127 BLD
- Closed
Heating and ventilation
HVAC - Construct new two storey (571.92m2) single family dwelling with attached garage and finished basment (350m2)
Applied Jan 7, 2016 · issued Jan 20, 2016 · completed Feb 13, 2019 · Permit 14 181451 HVA
- Closed
Plumbing
Plumbing - Construct new two storey (571.92m2) single family dwelling with attached garage and finished basment (350m2)
Applied Dec 18, 2014 · issued Dec 18, 2014 · completed Feb 13, 2019 · Permit 14 181451 PLB
- Closed
Drains and site services
Drain - Construct new two storey (571.92m2) single family dwelling with attached garage and finished basment (350m2)
Applied Dec 18, 2014 · issued Dec 18, 2014 · completed Feb 13, 2019 · Permit 14 181451 DRN
- Closed
New house · New building
Construct new two storey (571.92m2) single family dwelling with attached garage and finished basment (350m2)
Applied Jun 27, 2014 · issued Jul 23, 2014 · completed Jun 5, 2019 · 1 home added · Permit 14 181451 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a new accessory structure (cabana).
Decision: Approved (hearing Jun 13, 2018)
Filed Apr 24, 2018 · File A0325/18NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
245 Yonge Blvd · Minor variance
To construct a new two-storey detached dwelling.
100 m away · filed Jan 12, 2026 · Approved
248 Yonge Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing a one-storey front addition with a new covered porch.
150 m away · filed Nov 13, 2025 · Approved on condition
241 Yonge Blvd · Minor variance
To construct a new detached dwelling, with a balcony in the front and a rear deck.
130 m away · filed Dec 20, 2024 · Approved
273 Yonge Blvd · Minor variance
Proposed addition of rear extension, rear covered deck, carport and covered entranceway.
110 m away · filed Mar 27, 2024 · Approved
267 Yonge Blvd · Minor variance
Proposal to construct a new single family dwelling
80 m away · filed Sep 27, 2023 · Approved
21 Sandringham Dr · Minor variance
Proposal to construct a new dwelling. This application was deferred on September 8th, 2022, in order to revise plans.
130 m away · filed Jun 15, 2022 · Approved
266 Yonge Blvd · Minor variance
Proposal to construct a new dwelling.
120 m away · filed Dec 28, 2021 · Approved
297 Yonge Blvd · Minor variance
To construct a second storey addition, and a new rear deck.
210 m away · filed Nov 9, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.