Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

350 Perth Ave

Perth Square Park

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Installing a new prefabricated washroom building to replace the existing washroom. New sanitary, water, and electrical conduits and pipes will be connected to existing services.

    Applied Aug 26, 2026 · issued Sep 21, 2026 · Permit 26 225882 DRN

    Permit issued
  • Addition or alteration · Other

    Installing a new prefabricated washroom building to replace the existing washroom. New sanitary, water, and electrical conduits and pipes will be connected to existing services.

    Applied Aug 26, 2026 · issued Sep 18, 2026 · Permit 26 225882 BLD

    Permit issued
  • Plumbing

    Plumbing - Installing a new prefabricated washroom building to replace the existing washroom. New sanitary, water, and electrical conduits and pipes will be connected to existing services.

    Applied Aug 26, 2026 · issued Sep 21, 2026 · Permit 26 225882 PLB

    Permit issued
  • Demolition

    Demolition of existing washroom building for the park and replace with a new prefabricated washroom.

    Applied Mar 12, 2026 · issued Apr 10, 2026 · Permit 26 128895 DEM

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    240 m away · filed Jul 28, 2026 · Approved

  • 96 Edwin Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front second storey dormer, and a rear one-storey addition, a second storey addition with a deck, and a ground level deck.

    250 m away · filed Mar 10, 2025 · Approved

  • 267 Symington Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    150 m away · filed May 14, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    150 m away · filed Apr 6, 2024 · Approved

  • 9 Hugo Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front covered porch into habitable space), and a rear second storey addition.

    240 m away · filed Feb 13, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    190 m away · filed Aug 8, 2023 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    140 m away · filed Apr 11, 2022 · Approved

  • 315 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    150 m away · filed Apr 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.