Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

354 George St

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Other

    Upgrade the smoke alarm devices to code compliant horn/strobe

    Applied Nov 1, 2024 · issued Dec 31, 2024 · completed Oct 16, 2025 · Permit 24 233851 FSU

    Closed
  • Heating and ventilation

    REV01: Revision to permit 19-155447 HVA as per bubbled areas and attached cover letter.HVAC - Proposal for interuior alteration converting from a detention centre to a shelter for homeless men.

    Applied Dec 14, 2019 · issued Jan 16, 2020 · Permit 19 155447 HVA (revision 01)

    Revision issued
  • Addition or alteration · Change of use

    REV01: Revision to permit 19-155447 BLD as per bubbled areas and attached cover letter.Proposal for interior alteration converting from a detention centre to a shelter for homeless men.

    Applied Dec 14, 2019 · issued Jan 21, 2020 · Permit 19 155447 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for interuior alteration converting from a detention centre to a shelter for homeless men.

    Applied May 16, 2019 · issued Jul 8, 2019 · Permit 19 155447 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for interuior alteration converting from a detention centre to a shelter for homeless men.

    Applied May 16, 2019 · issued Jul 8, 2019 · Permit 19 155447 PLB

    Permit issued
  • Addition or alteration · Change of use

    Proposal for interior alteration converting from a detention centre to a shelter for homeless men.

    Applied May 16, 2019 · issued Jul 8, 2019 · Permit 19 155447 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 185 Gerrard St E · Minor variance

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    210 m away · filed Aug 28, 2026 · Hearing scheduled

  • 212 Dundas St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    210 m away · filed Apr 30, 2026 · Approved

  • 291 Jarvis St · Consent

    To obtain consent for the purpose of a stratified lot addition (air-rights) above an elevation of 119 m of the property municipally known as 285-291 Jarvis Street.

    80 m away · filed Apr 2, 2026 · Approved

  • 296 Jarvis St · Minor variance

    To alter the existing 18-storey mixed-use building (as approved under Site Specific Zoning By-law 298-88) by converting the existing service and retail office floor area on the first storey, and the hotel conference and banquet room floor areas on the second storey into a hotel with 50 guest suites. The existing second storey bridge connecting to 300 Jarvis Street will be demolished..

    230 m away · filed Jul 22, 2025 · Postponed

  • 291 George St · Minor variance

    To alter the existing five-storey apartment building by converting one parking space (located on the B1 parking level) into a storage area use. There will be a total of 47 parking spaces on-site instead of 48 parking spaces.

    140 m away · filed Jan 29, 2025 · Approved

  • 145 Mutual St · Minor variance

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    140 m away · filed Aug 28, 2024 · Approved

  • 202 Jarvis St · Minor variance

    To construct a new 14-storey building (the 15th storey will be used for mechanical equipment) with a front third storey roof terrace, east and west side roof terraces on the third, fifth and seventh storey, a rear seventh storey roof terrace, and a complete roof terrace on the roof level. The mixed-use building will contain classroom spaces, faculty offices, and common areas for academic purposes.

    250 m away · filed May 23, 2023 · Approved

  • 185 Gerrard St E · Minor variance

    To construct a new four-storey apartment building with front and rear rooftop decks. This building will contain a total of 28 residential dwelling units.

    210 m away · filed May 2, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.