Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

36 Ecker Dr

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to construct a new 2nd suite in the basement.

    Applied Nov 17, 2015 · issued May 30, 2016 · Permit 14 267121 HVA

    Inspections under way
  • Small residential project · Second suite (New)

    Revision 01 - Revision to change proposed shower to a tub & shower, maintain the existing laundry area for upper floor unit only and add a location for washer/drying for basement suite in proposed bathroom.Proposal for interior alterations to construct a new 2nd suite in the basement.

    Applied Oct 22, 2015 · issued Oct 29, 2015 · Permit 14 267121 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations to construct a new 2nd suite in the basement.Note : application includes backwater valve as per the attached plumbing data sheet.

    Applied Dec 23, 2014 · issued Jan 5, 2015 · Permit 14 267121 PLB

    Inspections under way
  • Small residential project · Second suite (New)

    Proposal for interior alterations to construct a new 2nd suite in the basement.

    Applied Dec 23, 2014 · issued Jan 2, 2015 · Permit 14 267121 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Savona Dr · Minor variance

    To widen the existing driveway.

    170 m away · filed Feb 3, 2025 · Approved

  • 11 Coules Crt · Minor variance

    To construct a new detached garage in the rear yard.

    190 m away · filed Oct 2, 2024 · Approved

  • 91 Delma Dr · Minor variance

    To construct a new duplex dwelling with an attached garage.

    150 m away · filed Mar 12, 2024 · Approved

  • 19 Whaley Dr · Minor variance

    To construct a new east side addition with integral garage, a second storey addition over the dwelling, a rear deck and a covered front porch. The existing rear yard garage will be demolished.

    220 m away · filed Jul 9, 2021 · Approved

  • 35 Coules Crt · Minor variance

    To construct a one-storey rear and east side addition that will include an attached garage, a second storey addition above the existing dwelling and a rear yard deck.

    200 m away · filed Jul 7, 2021 · Approved

  • 18 Whaley Dr · Minor variance

    To construct a two-storey east side addition to include an attached garage, a one-storey rear addition for a secondary suite and a new front porch and rear deck. The existing detached garage is to be demolished and the existing rear shed is to be maintained.

    190 m away · filed Dec 30, 2020 · Approved

  • 25 Hargrove Lane · Minor variance

    To construct a one-storey north side addition and a second storey addition above the altered dwelling with an integral garage and a basement walkout in the rear yard.

    160 m away · filed Dec 1, 2017 · Approved

  • 24 Hargrove Lane · Minor variance

    To construct a second storey addition above the existing dwelling that will be cantilevered on the south side with a carport below.

    180 m away · filed Sep 8, 2017 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.