Toronto address · Ward 10, Spadina-Fort York
36 Grange Ave
The City of Toronto has 6 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 01: Proposal for relocation of the ground floor utility room to the basement and rear yard landscaping changesProposal: Demolish existing 1 storey addition in rear yard and build 3 storey addition in rear yard; interior layout change for existing 3 storey in front yard.
Applied Jun 12, 2025 · issued Jul 22, 2025 · completed Jul 23, 2025 · Permit 24 152747 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal: Demolish existing 1 storey addition in rear yard and build 3 storey addition in rear yard; interior layout change for existing 3 storey in front yard.
Applied Nov 14, 2024 · issued Feb 13, 2025 · Permit 24 152747 HVA
- Permit issued
Drains and site services · Back water valve (Sewer only)
Back water valve
Applied Aug 12, 2024 · issued Aug 14, 2024 · Permit 24 152747 DRN
- Inspections under way
Plumbing
Plumbing - Proposal: Demolish existing 1 storey addition in rear yard and build 3 storey addition in rear yard; interior layout change for existing 3 storey in front yard.
Applied May 22, 2024 · issued Jul 24, 2024 · Permit 24 152747 PLB
- Closed
Small residential project · Multiple projects
Proposal: Demolish existing 1 storey addition in rear yard and build 3 storey addition in rear yard; interior layout change for existing 3 storey in front yard.
Applied May 22, 2024 · issued Jul 24, 2024 · completed Jul 23, 2025 · 1 home added · Permit 24 152747 BLD
- Inspections under way
Small residential project · Walk-Out stair
Basement walkout stairs in the front yard.
Applied Dec 1, 2023 · issued Dec 6, 2023 · Permit 23 231645 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing three-storey townhouse dwelling by constructing rear three-storey addition (with two-storeys cantilevered on the west side of the dwelling) to replace the existing rear one-storey addition, and a front basement walkout. There will be two residential dwelling units within this dwelling (one primary unit and one secondary suite in the basement).
Decision: Approved (hearing Mar 20, 2024)
Filed Jan 5, 2024 · File A0023/24TEY
What’s planned nearby
Development sites within 500 m
- Approved
5 storeys · 22 homes · Residential
50 m away · Rezoning · Approved · filed Oct 15, 2024
- Under review
24 storeys · 444 homes · Residential
240 m away · Rezoning · Under review · filed Dec 5, 2025
- Approved
19 storeys · Not stated in the file
390 m away · Site plan · Approved · filed Dec 21, 2021
- Now selling
- Approved
228-238 Simcoe Street and 115-123 St Patrick Street
Residential
460 m away · Condominium · Approved · filed Apr 11, 2024
- Approved
Neighbours’ Committee of Adjustment files within 250 m
34 Sullivan St · Minor variance
To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the west side.
120 m away · filed Jun 18, 2026 · Approved
52 Phoebe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).
240 m away · filed Jan 12, 2026 · Approved
28 Grange Ave · Minor variance
To construct a new three-storey detached dwelling (sixplex) with a covered front porch and stairs, a front basement walkout, a rear basement walkout, as well as rear first storey, second storey and third storey balconies with stairs. There will be a total of six dwelling units on the lot.
30 m away · filed Nov 12, 2025 · Approved
26 Sullivan St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition, a rear first storey covered deck with stairs and a rear second floor rooftop deck.
120 m away · filed Oct 24, 2025 · Approved
3 Grange Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey addition with a platform and stairs, a third storey addition with a rear balcony, and a fourth storey rooftop deck with a staircase enclosure. There will be a total of three residential dwelling units on this lot (one unit occupying the basement and first level, one unit occupying the first and second level, and one unit occupying the second, third, and rooftop level).
110 m away · filed Sep 16, 2025 · Approved
150 Beverley St · Minor variance
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
210 m away · filed Jul 17, 2025 · Approved
50 Phoebe St · Minor variance
To construct a front basement walkout with stairs.
240 m away · filed Nov 19, 2024 · Approved
26 Grange Ave · Minor variance
To construct a new three-storey detached building (duplex) with a covered front porch with stairs, a front basement walkout with a terrace, and rear second and third floor balconies. Also, to construct a two-storey ancillary building (for one two-storey laneway suite with a basement and a one-car garage on the ground floor) in the rear yard of the property abutting the laneway. The existing garage will be demolished. There will be a total of three dwelling units on the lot (two units within the main building (duplex) and one unit within the laneway suite).
30 m away · filed Jul 18, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.