Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

36 High St

The City of Toronto has 6 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Make basement walkout and finishes and underpining to a single family dwelling.

    Applied Aug 20, 2026 · issued Sep 4, 2026 · Permit 19 175964 HVA

    Permit issued
  • Small residential project · Deck

    REV01: Existing front canopy to be repaired and extended.Proposal to demolish an existing front concrete pad and build a new one; existing canopy repair

    Applied Aug 10, 2021 · issued Nov 15, 2021 · completed Nov 30, 2021 · Permit 21 152117 BLD (revision 01)

    Closed
  • Small residential project · Deck

    Proposal to demolish an existing front concrete pad and build a new one; existing canopy repair

    Applied May 8, 2021 · issued Jun 4, 2021 · completed Nov 30, 2021 · Permit 21 152117 BLD

    Closed
  • Drains and site services

    Drain - Make basement walkout and finishes and underpining to a single family dwelling.

    Applied Jul 25, 2019 · issued Jul 25, 2019 · Permit 19 175964 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Make basement walkout and finishes and underpining to a single family dwelling.

    Applied Jun 21, 2019 · issued Jul 19, 2019 · Permit 19 175964 BLD

    Inspections under way
  • Plumbing

    Plumbing - Make basement walkout and finishes and underpining to a single family dwelling.

    Applied Jun 21, 2019 · issued Jul 19, 2019 · Permit 19 175964 PLB

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a new front porch.

    Decision: Approved (hearing Oct 14, 2021)

    Filed Aug 4, 2021 · File A0412/21EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 125 The Queensway

    50 storeys · Mixed use

    320 m away · Rezoning · Under appeal · filed Mar 11, 2025

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Smithfield Dr · Minor variance

    To construct a second-storey addition above the existing dwelling, and a two-storey rear addition.

    140 m away · filed Aug 13, 2026 · Hearing scheduled

  • 11 Cannon Rd · Minor variance

    To convert the existing attached garages into two additional dwelling units. A total of 10 dwelling units will be provided.

    250 m away · filed Jul 29, 2026 · Approved

  • 48 Waniska Ave · Minor variance

    To permit interior alterations to the existing apartment building in order to accomodate 2 additional dwelling units. A total of 8 dwelling units will be provided.

    250 m away · filed Sep 23, 2025 · Approved

  • 40 Stephen Dr · Minor variance

    To construct a second storey addition above the existing dwelling, a new front porch and a rear yard deck.

    110 m away · filed Mar 27, 2024 · Approved

  • 44 Smithfield Dr · Minor variance

    To construct a new garden suite.

    190 m away · filed Dec 7, 2023 · Approved

  • 140 The Queensway · Minor variance

    To construct a six-storey apartment building.

    190 m away · filed Mar 6, 2023 · Approved

  • 19 Smithfield Dr · Minor variance

    To construct a rear second storey addition above the existing dwelling.

    150 m away · filed Feb 17, 2023 · Approved

  • 12 Smithfield Dr · Minor variance

    To construct a new north side deck with a second storey above it and a second storey rear addition.

    220 m away · filed Nov 18, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.