Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

36 Noble St

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal for Basement Underpinning, 2 Storey rear Addition, and second suite.

    Applied Sep 28, 2021 · issued Nov 1, 2021 · Permit 21 218854 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for Basement Underpinning, 2 Storey rear Addition, and second suite.

    Applied Sep 28, 2021 · issued Nov 1, 2021 · 1 home added · Permit 21 218854 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for Basement Underpinning, 2 Storey rear Addition, and second suite.

    Applied Sep 28, 2021 · issued Nov 1, 2021 · Permit 21 218854 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for Basement Underpinning, 2 Storey rear Addition, and second suite.

    Applied Sep 28, 2021 · issued Nov 1, 2021 · Permit 21 218854 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 6 Noble Street

    12 storeys · 169 homes · Mixed use

    100 m away · Condominium · Under review · filed Dec 16, 2021

    Under review
  • 1266 Queen Street West

    27 storeys · 362 homes · Mixed use

    150 m away · Site plan · Approved · filed Apr 21, 2023

    Approved
  • 1303-1337 Queen Street West and 220 Cowan Avenue

    16 storeys · 175 homes · Mixed use

    250 m away · Site plan · Under review · filed Jun 11, 2026

    Under review
  • 450 Dufferin Street

    18 storeys · 176 homes · Mixed use

    280 m away · Site plan · Under review · filed Jun 30, 2025

    Under review
  • 340-370 Dufferin Street

    29 storeys · 768 homes · Mixed use

    290 m away · Site plan · Under review · filed Aug 31, 2022

    Under review
  • 31-33 Gladstone Avenue

    6 storeys · 28 homes · Residential

    350 m away · Site plan · Under review · filed Dec 10, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 22 Brock Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front basement walkout, a rear two-storey addition (replacing the existing rear one-storey addition) with a second storey deck, and a third storey addition.

    120 m away · filed Jan 16, 2026 · Approved

  • 25 Brock Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a one-storey north side and east rear addition, and to construct a rear third storey dormer addition. The attic will be converted into habitable space. The existing rear one-storey addition will be demolished.

    80 m away · filed May 27, 2025 · Approved

  • 1229 Queen St W · Minor variance

    To alter the existing two-storey building (Community Centre) by constructing stepped four to seven-storey additions. This altered mixed-use building will contain an expansion of healthcare services and there will be a total number of 55 affordable residential dwelling units within the building on this lot. Also, to reduce the required parking spaces to 14 parking spaces (located at grade abutting Milkyway Lane). No visitor parking spaces will be provided.

    210 m away · filed Sep 13, 2024 · Approved

  • 11 Brock Ave · Minor variance

    To construct a new four-storey apartment building (with one mechanical penthouse level above) containing 42 affordable dwelling units, with an internal courtyard on the ground level, an internal terrace (outdoor amenity space) on the second storey (above the ground level), a terrace (outdoor amenity space) on a south portion of the third storey (above the second storey), and a green roof on the north portion of the fourth storey.

    90 m away · filed Jul 25, 2024 · Approved

  • 1354 Queen St W · Minor variance

    To alter the development standards for the 11-storey mixed-use building (approved under Site Specific Zoning By-Law 334-2024), by increasing the height from 39 m to 40 m, reducing the terracing setbacks fronting Abbs Street and Brock Avenue, increasing the total gross floor area, increasing the residential gross floor area, and reducing the indoor and outdoor amenity space. This building will provide a total of 222 residential dwelling units, as well as non-residential spaces (to be located on the ground floor).

    160 m away · filed Dec 4, 2023 · Approved

  • 6 Noble St · Minor variance

    To alter the development standards for an 8-storey (33 m) mixed-use building (approved under Site Specific Zoning By-law 862-2021(OLT)) by increasing the building height to 11-storey (43 m, including a mechanical penthouse), as well as the total gross floor area (from 9,500 m² to 12,110 m²), and to reduce the mechanical penthouse building setback (east and south lot lines).

    120 m away · filed Nov 27, 2023 · Approved

  • 69 Elm Grove Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    190 m away · filed Jan 17, 2023 · Approved

  • 14 Seaforth Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front basement walkout leading to a secondary suite.

    230 m away · filed Jan 5, 2023 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.