Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

36 Yore Rd

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Propose new basement apartment

    Applied Jan 27, 2020 · issued Mar 4, 2020 · completed Oct 16, 2020 · Permit 20 104822 PLB

    Closed
  • Small residential project · Second suite (New)

    Proposed interior alterations to convert existing two unit dwelling into a three unit dwelling.

    Applied Jan 15, 2020 · issued Mar 3, 2020 · completed Oct 21, 2020 · 1 home added · Permit 20 104822 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to have 2 unit dwellings on the ground and second floor

    Applied Feb 11, 2019 · issued Feb 12, 2019 · completed Jun 5, 2019 · Permit 18 265488 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to have 2 unit dwellings on the ground and second floor

    Applied Dec 6, 2018 · issued Dec 20, 2018 · completed Jun 11, 2019 · Permit 18 265488 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal for interior alterations to have 2 unit dwellings on the ground and second floor

    Applied Dec 6, 2018 · issued Dec 20, 2018 · completed Jun 11, 2019 · Permit 18 265488 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To convert a portion of the existing dwelling into a secondary suite. The dwelling will contain a total of 2 Secondary suites.

    Decision: Approved (hearing Dec 5, 2019)

    Filed Oct 30, 2019 · File A0560/19EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 61 Richardson Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a new rear yard deck. The existing ancillary structure in the rear yard will be maintained.

    210 m away · filed Jul 24, 2025 · Approved

  • 55 Lonborough Ave · Minor variance

    To construct a new fourplex dwelling and a garden suite in the rear yard.

    150 m away · filed Jan 2, 2025 · Refused

  • 96 Lonborough Ave · Minor variance

    To construct a one storey rear addition, containing two additional residential units. A total of 4 residential units will be provided.

    100 m away · filed Mar 7, 2024 · Approved

  • 63 Lonborough Ave · Minor variance

    To construct a second storey addition above the existing dwelling, a two-storey rear addition, a new rear yard balcony and a new detached garage in the rear yard.

    120 m away · filed Oct 14, 2022 · Approved

  • 9 Lester Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a two-storey rear addition.

    120 m away · filed Aug 5, 2021 · Approved

  • 39 Lonborough Ave · Minor variance

    To construct a new detached dwelling with second storey rear and front balconies.

    220 m away · filed Mar 22, 2021 · Application withdrawn

  • 395 Kane Ave · Minor variance

    To construct a two-storey front addition, a one-storey rear addition, a new front porch, a new rear yard deck, and a front and rear parking space.

    240 m away · filed Nov 10, 2020 · Approved

  • 25 Glenhaven St · Minor variance

    To legalize and to maintain a deck in the rear yard.

    110 m away · filed Oct 14, 2020 · Application withdrawn

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.