Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

37 Loma Rd

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Sump pumps and backflow devices to be added

    Applied Nov 2, 2021 · issued Nov 3, 2021 · Permit 20 212015 DRN

    Permit issued
  • Plumbing

    CHANGE OF SCOPE OF WORK: from 2 dwelling units to a single family dwelling. (Related to Building Permit Application No: 20-212015) Remove secondary unit.

    Applied Nov 2, 2021 · issued Nov 4, 2021 · Permit 20 212015 PLB (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    REV - 01 Changes as per bubbled drawings: to elminate the secondary unit in the basement.

    Applied Oct 25, 2021 · issued Mar 10, 2023 · 1 home removed · Permit 20 212015 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for interior alterations to convert to a 2-unit dwelling and reconstruct rear basement walkout, front and rear porches. See also 20 2182506 ZZC and 19 263759 WNP.

    Applied Oct 28, 2020 · issued Nov 23, 2020 · 1 home added · Permit 20 212015 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to convert to a 2-unit dwelling and reconstruct rear basement walkout, front and rear porches. See also 20 2182506 ZZC and 19 263759 WNP.

    Applied Oct 28, 2020 · issued Nov 23, 2020 · Permit 20 212015 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 880-890 The Queensway

    8 storeys · 103 homes · Mixed use

    390 m away · Condominium · Approved · filed Aug 1, 2025

    Approved
  • 875 The Queensway

    11 storeys · 148 homes · Mixed use

    430 m away · Site plan · Approved · filed Sep 1, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 72 Edgecroft Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed Dec 17, 2025 · Approved

  • 38 Edgecroft Rd · Minor variance

    To construct a new triplex dwelling and to permit a front yard parking pad. The existing detached garage in the rear will maintained.

    210 m away · filed Dec 4, 2025 · Approved

  • 70 Edgecroft Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Jun 19, 2025 · Approved

  • 60 Athol Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Nov 5, 2024 · Approved

  • 41 Edgecroft Rd · Minor variance

    To construct a new detached garage in the rear yard.

    170 m away · filed Nov 1, 2024 · Approved

  • 46 Chartwell Rd · Minor variance

    To construct a new detached dwelling with an attached garage, and a deck in the rear yard.

    230 m away · filed Feb 7, 2024 · Approved

  • 26 Smith Cres · Minor variance

    To construct a new detached garage that will contain a second storey garden suite in the rear yard.

    190 m away · filed Jan 2, 2024 · Approved

  • 2 Cochrane Dr · Minor variance

    To construct a new detached garage on the south side of the existing dwelling.

    160 m away · filed Oct 4, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.