Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

377 Bering Ave

The City of Toronto has 4 building permits since 2017 (4 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Interior renovations and change of use from Group F2 to Group D major occupancy. Upgrades associated with change of use

    Applied Jun 26, 2024 · issued Oct 1, 2024 · Permit 24 170555 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior renovations and change of use from Group F2 to Group D major occupancy. Upgrades associated with change of use

    Applied Jun 26, 2024 · issued Nov 12, 2024 · Permit 24 170555 HVA

    Permit issued
  • Addition or alteration · Fire damage

    REVISION - change roof framing from open web steel joists to I-BeamsThe building sustained damage as the result of fire. Repairs will be required prior to occupancy. Pleaserefer to the report and drawings for further detail.

    Applied Jun 19, 2024 · issued Jul 25, 2024 · Permit 21 225925 BLD (revision 01)

    Revision issued
  • Addition or alteration · Fire damage

    The building sustained damage as the result of fire. Repairs will be required prior to occupancy. Pleaserefer to the report and drawings for further detail.

    Applied Oct 14, 2021 · issued Nov 29, 2021 · Permit 21 225925 BLD

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent to sever the property into five industrial lots and to create easements/rights-of-way for the purpose of vehicular and pedestrian access.

    Decision: Approved (hearing Nov 22, 2018)

    Filed May 10, 2016 · File B34/16EYK

    Closed
  • Minor variance · Other

    To maintain the existing building on a reduced lot (as a result of the associated consent application B34/16EYK).

    Decision: Approved (hearing Nov 22, 2018)

    Filed May 10, 2016 · File A374/16EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 891 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    70 m away · filed Jun 11, 2026 · Hearing scheduled

  • 899 Kipling Ave · Minor variance

    To legalize and to maintain a one-storey rear addition and to construct a one-storey addition along the south side of the building.

    110 m away · filed Feb 28, 2024 · Deferred

  • 891 Kipling Ave · Minor variance

    To maintain the existing building.

    70 m away · filed Sep 2, 2022 · Approved

  • 889 Kipling Ave · Minor variance

    To maintain the existing building.

    80 m away · filed Sep 2, 2022 · Approved

  • 362 Olivewood Rd · Minor variance

    To permit vehicle car sales or a vehicle dealership within the existing vehicle repair shop or vehicle service shop.

    190 m away · filed Mar 8, 2021 · Approved

  • 889 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    80 m away · filed Feb 3, 2021 · Approved

  • 113 Judge Rd · Minor variance

    To construct a detached garage in the rear yard.

    150 m away · filed Sep 23, 2019 · Approved

  • 333 Bering Ave · Minor variance

    To legalize and maintain eight office units in the existing building.

    240 m away · filed Mar 20, 2019 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.