Toronto address · Ward 14, Toronto-Danforth
38 1/2 Wardell St
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Proposal for construction of third floor addition and ground floor deck including revision of floor plans layout and second floor deck size.(Proposal to carry out interior alterations and construct second storey deck. Converting existing sfd to converted two unit dwelling by creating second unit on second floor.)
Applied Nov 12, 2014 · issued Apr 16, 2015 · Permit 14 160430 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal to carry out interior alterations and construct second storey deck. Converting existing sfd to converted two unit dwelling by creating second unit on second floor.
Applied Aug 22, 2014 · issued Aug 27, 2014 · Permit 14 160430 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to carry out interior alterations and construct second storey deck. Converting existing sfd to converted two unit dwelling by creating second unit on second floor.
Applied May 23, 2014 · issued Jun 5, 2014 · Permit 14 160430 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to carry out interior alterations and construct second storey deck. Converting existing sfd to converted two unit dwelling by creating second unit on second floor.
Applied May 23, 2014 · issued Jun 5, 2014 · Permit 14 160430 BLD
- Inspections under way
Small residential project · Addition(s)
Construct one storey addition at rear
Applied Dec 13, 2005 · issued Dec 13, 2005 · Permit 05 209536 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
6 storeys · 15 homes · Mixed use
300 m away · Site plan · Approved · filed Apr 28, 2023
- Approved
9 storeys · 78 homes · Mixed use
480 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling.
130 m away · filed Jan 24, 2024 · Approved
1000 Dundas St E · Minor variance
To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.
210 m away · filed Sep 15, 2023 · Approved
8 De Grassi St · Minor variance
To construct a 6-storey mixed-use building, including 1 commercial unit on the ground floor and 15 residential units with a mix of bedroom types, front second to sixth storey balconies, a rooftop amenity space with an access, and a mechanical penthouse. This application is associated with Site Plan Application # 17 279888 STE 30 SA that is under review.
230 m away · filed Dec 19, 2022 · Withdrawn
290 Logan Ave · Minor variance
To alter the existing two-storey rowhouse end unit by constructing a third-storey addition with a front third-floor deck.
240 m away · filed Apr 13, 2022 · Approved
161 Boulton Ave · Minor variance
To construct a rear one-storey ancillary building to contain a gym and storage area.
220 m away · filed Nov 16, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.