Toronto address · Ward 3, Etobicoke-Lakeshore
3823 Bloor St W
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Addition or alteration · Interior alterations
Interior Alterations and repairs to the 2nd floor existing Residential unit
Applied Nov 30, 2015 · issued Jan 29, 2016 · Permit 15 258621 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
44 storeys · 530 homes · Mixed use
60 m away · Site plan · Approved · filed Aug 19, 2025
- Approved
3825 Bloor Street West and 5230 Dundas Street West
36 storeys · 525 homes · Mixed use
70 m away · Site plan · Approved · filed Jul 4, 2024
- Under review
- Under review
43 storeys · 198 homes · Residential
130 m away · Site plan · Under review · filed Jun 2, 2026
- Approved
- Under review
39 storeys · 436 homes · Residential
170 m away · Site plan · Under review · filed Apr 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
4 Beamish Dr · Minor variance
To alter the development standards as outlined in By-law 304-2025 (OLT) to accommodate a 44-storey mixed-use building containing 521 residential units.
30 m away · filed Jun 11, 2026 · Approved
8 Jopling Ave S · Minor variance
To amend the development standards as outlined in By-law Number 187-2022 as it relates to the construction of a mixed-use development consisting of a 29 storey mixed use tower with a 2 storey mechanical penthouse and amenity space above and a 38 storey mix-use tower with a 2 storey mechanical penthouse and amenity space above connected by a 6-storey base with amenity space above.
200 m away · filed Sep 19, 2025 · Approved
5 Jopling Ave S · Minor variance
To modify the development standards from site specific By-law 963-2023 related to setbacks, height, canopy depth, and the podium and tower floorplate.
150 m away · filed Feb 3, 2025 · Approved
5 Streight Lane · Minor variance
To construct a deck in the rear yard.
240 m away · filed Jun 14, 2024 · Approved
26 Jopling Ave S · Minor variance
To construct a mixed-use development consisting of a 29 storey mixed use tower with a 2 storey mechanical room and amenity space above and a 38 storey mix-use tower with a 2 storey mechanical room and amenity space above connected by a 6-storey base with amenity space above.
230 m away · filed Jul 5, 2023 · Approved
3832 Bloor St W · Minor variance
To construct a second storey addition above the existing building.
80 m away · filed Jun 19, 2018 · Approved
13 Prennan Ave · Minor variance
To construct a new detached dwelling with an integral garage.
180 m away · filed Mar 1, 2018 · Approved
12 Jopling Ave S · Minor variance
To widen the existing driveway.
200 m away · filed Oct 5, 2017 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.