Toronto address · Ward 9, Davenport
39 Bank St
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only)
Applied Apr 24, 2020 · issued Apr 27, 2020 · completed May 5, 2020 · Permit 20 138380 DRN
- Inspections under way
Plumbing
Plumbing - Interior alteration to existing single family dwelling. Renovate kitchen on ground floor and renovate bathroom on second floor.
Applied Feb 20, 2009 · issued Feb 23, 2009 · Permit 09 110937 PLB
- Inspections under way
Small residential project · Interior alterations
Interior alteration to existing single family dwelling. Renovate kitchen on ground floor and renovate bathroom on second floor.
Applied Feb 20, 2009 · issued Feb 23, 2009 · Permit 09 110937 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · 176 homes · Mixed use
280 m away · Site plan · Under review · filed Jun 30, 2025
- Under review
8 storeys · 57 homes · Mixed use
290 m away · Site plan · Under review · filed Feb 15, 2023
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
330 m away · Condominium · Under review · filed Oct 12, 2021
Neighbours’ Committee of Adjustment files within 250 m
11 Bank St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.
80 m away · filed Oct 24, 2024 · Approved
524 Dufferin St · Minor variance
To alter the existing two- storey dwelling by demolishing the rear one-storey addition and constructing a new two-storey addition. Also, to construct a partial third storey addition with a rear balcony.
170 m away · filed Aug 30, 2023 · Approved
6 Delaney Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (east) three-storey addition and a third storey addition, a rear second storey balcony and a rear third storey balcony.
220 m away · filed Nov 30, 2022 · Approved
114 Sheridan Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a rear second and third storey addition.
230 m away · filed Nov 24, 2022 · Approved
68 Florence St · Minor variance
To alter the existing two-unit, two-and-one-half-storey townhouse by constructing a rear second storey addition and a new basement secondary suite.
180 m away · filed Oct 7, 2022 · Approved
25 Gordon St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition, a new front porch and basement walkout, a rear third storey balcony, second and third storey front bay windows, and a side (west) basement walkout.
120 m away · filed Sep 15, 2022 · Approved
6 Bank St · Minor variance
To alter the existing three-storey semi-detached dwelling by reconstructing the existing enclosed front porch.
120 m away · filed Apr 19, 2022 · Approved
11 Sheridan Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition and a three-storey rear addition with a rear third storey balcony.
140 m away · filed Jan 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.