Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

399 Yonge St

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing unit.

    Applied Oct 14, 2020 · issued Nov 24, 2020 · completed Feb 11, 2022 · Permit 20 206557 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations and create a second unit between existing units #1 and #3.

    Applied Oct 14, 2020 · issued Nov 25, 2020 · completed Feb 11, 2022 · Permit 20 206557 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing ground floor restaurant. 30 seats. New tenant - "Banh Mi Boys".Floor assembly above 1-st floor shell be 45 min fire rated. M.P..

    Applied Dec 10, 2012 · issued Jan 29, 2013 · completed Dec 6, 2021 · Permit 12 291446 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing ground floor restaurant. 30 seats. New tenant - "Banh Mi Boys".

    Applied Dec 10, 2012 · issued Feb 26, 2013 · completed Dec 6, 2021 · Permit 12 291446 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to existing ground floor restaurant. 30 seats. New tenant - "Banh Mi Boys".

    Applied Dec 10, 2012 · issued Feb 22, 2013 · completed Dec 6, 2021 · Permit 12 291446 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 332 Yonge St · Minor variance

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    220 m away · filed Jul 24, 2026 · Hearing scheduled

  • 50 Gerrard St E · Consent

    To obtain consent to sever a portion of stratified land (air-rights above an elevation of 121 m) for the purpose of a lot addition.

    220 m away · filed May 15, 2026 · Postponed

  • 8 Elm St · Consent

    To obtain consent to sever the property into two lots, as well as maintaining existing easements/rights-of-way.

    160 m away · filed Feb 23, 2024 · Approved

  • 50 Gerrard St E · Minor variance

    To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.

    220 m away · filed Nov 14, 2023 · Approved

  • 340 Yonge St · Minor variance

    To permit an amusement arcade use (claw machines) on the ground level of the existing three-storey commercial building.

    180 m away · filed Sep 8, 2023 · Approved

  • 363 Yonge St · Minor variance

    To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).

    120 m away · filed Dec 30, 2022 · Approved

  • 8 Elm St · Minor variance

    To permit the reduction of residential parking spaces provided within the 68-storey mixed-use building, currently under review by Site Plan Control Application (File Number 21 214195 STE 11 SA). There will be a total of 807 residential dwelling units within this building.

    160 m away · filed Apr 7, 2022 · Approved

  • 64 McGill St · Minor variance

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    210 m away · filed Oct 6, 2021 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.