Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

64 McGill St

The City of Toronto has 12 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Revision #03 -Revision is for the basement and ground floor. Proposal to add laundry on the ground floor, a laundry tub in the basement and to remove the plumbing work on the second floor. REV01: changes as per data sheet

    Applied Aug 23, 2021 · issued Aug 23, 2021 · completed May 31, 2022 · Permit 20 166884 PLB (revision 03)

    Closed
  • Small residential project · Multiple projects

    Rev 03 - Proposed revision is for baement and ground floor interior alterationsREV03: changes as per drawings

    Applied Aug 19, 2021 · issued Sep 2, 2021 · completed May 31, 2022 · Permit 20 166884 BLD (revision 02)

    Closed
  • Plumbing

    Revision #02 - Proposal to add laundry on the ground floor, a laundry tub in the basement and to remove the plumbing work on the second floor. REV01: changes as per data sheet

    Applied Apr 22, 2021 · issued Apr 22, 2021 · completed May 31, 2022 · Permit 20 166884 PLB (revision 02)

    Closed
  • Small residential project · Multiple projects

    Rev 02 - Proposed revision for basement walkout and secondary suiteREV01: changes as per drawings

    Applied Nov 25, 2020 · completed Jul 13, 2021 · Permit 20 166884 XXX

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to underpin the existing single family dwelling. Basement to remain unfinished.

    Applied Sep 23, 2020 · issued Sep 28, 2020 · completed May 31, 2022 · Permit 20 166884 HVA

    Closed
  • Drains and site services

    Drain - Proposal to underpin the existing single family dwelling. Basement to remain unfinished.

    Applied Aug 18, 2020 · issued Aug 18, 2020 · completed May 31, 2022 · Permit 20 166884 DRN

    Closed
  • Plumbing

    REV01: changes as per data sheet

    Applied Aug 18, 2020 · issued Aug 26, 2020 · completed May 31, 2022 · Permit 20 166884 PLB (revision 01)

    Closed
  • Small residential project · Multiple projects

    REV01: changes as per drawings

    Applied Aug 18, 2020 · issued Oct 8, 2020 · completed May 31, 2022 · Permit 20 166884 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Proposal to underpin the existing single family dwelling. Basement to remain unfinished.

    Applied Jul 13, 2020 · issued Jul 23, 2020 · completed May 31, 2022 · Permit 20 166884 BLD

    Closed
  • Plumbing

    Plumbing - underpinning, interior alterations, walk out stair to basement

    Applied Jul 13, 2020 · issued Jul 23, 2020 · completed May 31, 2022 · Permit 20 166884 PLB

    Closed
  • Small residential project · Party wall admin permits

    admin permit for work in conjunction with 62 mcgill

    Applied Jul 24, 2015 · issued Jul 24, 2015 · completed Jan 2, 2025 · Permit 15 196264 BLD

    Closed
  • Small residential project · Party wall admin permits

    party wall admin permit for work at 62 McGill

    Applied May 27, 2015 · issued May 28, 2015 · completed Jan 2, 2025 · Permit 15 163683 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    Decision: Approved (hearing Jan 26, 2022)

    Filed Oct 6, 2021 · File A1265/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 50 Gerrard St E · Consent

    To obtain consent to sever a portion of stratified land (air-rights above an elevation of 121 m) for the purpose of a lot addition.

    100 m away · filed May 15, 2026 · Postponed

  • 97 Granby St · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    150 m away · filed Jun 18, 2025 · Approved

  • 50 Gerrard St E · Minor variance

    To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.

    100 m away · filed Nov 14, 2023 · Approved

  • 109 1/2 Granby St · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    190 m away · filed Dec 7, 2021 · Approved

  • 403 Church St · Consent

    To obtain consent to perform a stratified severance and to create easements/right-of-ways.

    180 m away · filed May 14, 2020 · Approved

  • 63 McGill St · Minor variance

    To alter the existing 2½-storey townhouse by performing interior alterations to increase the amount of floor space on the ground floor.

    50 m away · filed Apr 9, 2020 · Approved

  • 70 Carlton St · Consent

    To obtain consent to sever the property to create five lots.

    180 m away · filed Jan 7, 2020 · Withdrawn

  • 385 Church St · Minor variance

    To alter the 12-storey mixed-use building with 120 affordable rental dwelling units (Building Permit 18 112956 BLD 00 BA) by constructing an elevator veisbule at Penthouse level.

    140 m away · filed Jan 30, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.