Toronto address · Ward 15, Don Valley West
40 Saintfield Ave
The City of Toronto has 8 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev 01 - New stove in the basement.Proposal for multiple projects (second floor addition, interior alterations, exterior cladding alterations, rear yard deck. garage).
Applied Jun 8, 2026 · issued Aug 17, 2026 · Permit 25 162023 BLD (revision 01)
- Permit issued
Heating and ventilation
HVAC - Proposal for multiple projects (second floor addition, interior alterations, exterior cladding alterations, rear yard deck. garage).
Applied Jul 7, 2025 · issued Jul 24, 2025 · Permit 25 162023 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for multiple projects (addition, interior alterations, exterior cladding alterations, rear yard deck. garage and second floor balcony).
Applied May 20, 2025 · issued Jun 11, 2025 · Permit 25 162023 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for multiple projects (second floor addition, interior alterations, exterior cladding alterations, rear yard deck. garage).
Applied May 20, 2025 · issued Jun 11, 2025 · Permit 25 162023 BLD
- Closed
Small residential project · Interior alterations
Proposed interior alteration to existing basement.
Applied Jul 12, 2024 · issued Jul 17, 2024 · completed Sep 3, 2025 · Permit 24 179746 BLD
- Closed
Plumbing
Plumbing - Proposed interior alteration to existing basement.
Applied Jul 12, 2024 · issued Jul 17, 2024 · completed Sep 3, 2025 · Permit 24 179746 PLB
- Cancelled
Small residential project · Interior alterations
proposal for Interior alteration to existing basement.
Applied Jun 27, 2024 · completed Jul 2, 2024 · Permit 24 170944 BLD
- Cancelled
Plumbing
Plumbing - proposal for Interior alteration to existing basement.
Applied Jun 27, 2024 · completed Jul 2, 2024 · Permit 24 170944 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing detached dwelling by constructing a first floor addition to the garage and a second storey addition atop the existing dwelling.
Decision: Approved (hearing Jan 16, 2025)
Filed Nov 14, 2024 · File A0561/24NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
9 Salonica Rd · Minor variance
To construct a new detached dwelling and pool cabana. The application was deferred from the hearing of 21 Mar. 2024.
250 m away · filed Jan 26, 2024 · Approved
32 Saintfield Ave · Minor variance
Proposal to construct a new single family dwelling.
130 m away · filed Jan 9, 2023 · Approved
188 The Bridle Path · Minor variance
Proposal to construct a new two-storey detached single family dwelling
190 m away · filed May 12, 2022 · Approved
196 The Bridle Path · Minor variance
To construct a two storey rear addition.
240 m away · filed Apr 1, 2022 · Approved
32 Saintfield Ave · Minor variance
To construct a new dwelling. Please note, this file was previously deferred on April 14th, 2022 in order for the Applicant to make changes to the application.
130 m away · filed Jan 31, 2022 · Approved
6 Peebles Ave · Minor variance
To construct a new dwelling.
210 m away · filed Mar 18, 2021 · Approved
15 Salonica Rd · Minor variance
To construct a front porch addition.
230 m away · filed Jan 14, 2019 · Approved
176 The Bridle Path · Minor variance
To construct a canopy to the north portion of the existing dwelling.
230 m away · filed Dec 4, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.