Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

40 Silverhill Dr

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Walk-Out stair

    Proposal to construct a basement entrance at the side of an existing SFD-detached dwelling.

    Applied Dec 9, 2019 · issued Dec 17, 2019 · Permit 19 258666 BLD

    Work not started
  • Heating and ventilation

    HVAC - Proposed basement alterations, interior atlerations, second floor addition and rear yard deck.

    Applied Feb 5, 2018 · issued Feb 6, 2018 · completed Sep 19, 2019 · Permit 17 255194 HVA

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install back water valve

    Applied Jan 30, 2018 · issued Jan 30, 2018 · completed May 29, 2018 · Permit 18 111661 DRN

    Closed
  • Plumbing

    Plumbing - Proposed basement alterations, interior atlerations, second floor addition and rear yard deck.

    Applied Oct 30, 2017 · issued Dec 22, 2017 · completed Sep 19, 2019 · Permit 17 255194 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed basement alterations, interior atlerations, second floor addition and rear yard deck.

    Applied Oct 30, 2017 · issued Dec 22, 2017 · completed Sep 19, 2019 · Permit 17 255194 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 33 Statler Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Jun 2, 2026 · Approved

  • 57 Silverhill Dr · Minor variance

    To legalize and to maintain the rear second storey platform.

    120 m away · filed May 21, 2024 · Approved

  • 57 Silverhill Dr · Minor variance

    To construct a second storey above the existing dwelling, a new front porch and a new covered rear deck.

    120 m away · filed Aug 23, 2021 · Approved

  • 26 Tremont Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed Mar 22, 2021 · Approved

  • 74 Paulart Dr · Minor variance

    To construct a second and third storey addition above the existing dwelling, a new front porch and a rear yard deck.

    160 m away · filed Apr 6, 2020 · Approved

  • 32 Silverhill Dr · Minor variance

    To construct a new second storey above the existing dwelling and a two-storey front addition.

    70 m away · filed Nov 7, 2019 · Approved

  • 59 Silverhill Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    130 m away · filed Sep 23, 2019 · Approved

  • 3983 Bloor St W · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Aug 23, 2019 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.