Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

400 Wellesley St E

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Proposal for interior alterations to an existing 3 storey SFD-townhouse.

    Applied Jan 26, 2018 · issued Mar 6, 2018 · Permit 18 110335 BLD

    Inspections under way
  • Small residential project · Interior alterations

    Proposal to do interior alterations

    Applied Dec 8, 2017 · completed Jan 22, 2018 · Permit 17 273053 BLD

    Cancelled
  • Small residential project · Party wall admin permits

    Administration permit for construction work on the party wall shared with 402 Wellesley St E.

    Applied Sep 7, 2017 · issued Dec 4, 2017 · completed May 10, 2021 · Permit 17 229385 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 451 Wellesley St E · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.

    190 m away · filed Sep 9, 2025 · Approved

  • 32 Salisbury Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).

    190 m away · filed Jun 11, 2025 · Approved

  • 5 Parkview Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.

    190 m away · filed Jul 17, 2024 · Approved

  • 49 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.

    220 m away · filed May 13, 2024 · Approved

  • 435 Sackville St · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a new rear ground floor solarium.

    250 m away · filed Apr 17, 2023 · Approved

  • 116 Amelia St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.

    110 m away · filed Jan 30, 2023 · Approved

  • 82 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).

    190 m away · filed Dec 14, 2022 · Approved

  • 340 Wellesley St E · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.

    170 m away · filed Nov 21, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.