Toronto address · Ward 10, Spadina-Fort York
401 Queens Quay W
The City of Toronto has 10 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Sprinklers
Installation of new sprinkler head in each existing garbage chute room from level 2 to level 8.
Applied Jan 19, 2026 · issued Feb 13, 2026 · Permit 26 106076 FSU
- Closed
Addition or alteration · Other
Proposed wholesale removal and replacement of glass block masonry walls at swimming pool.
Applied Jul 22, 2020 · issued Jul 29, 2020 · completed Apr 29, 2021 · Permit 20 171402 BLD
- Inspections under way
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposed replacment of 2 existing heating boilers with 6 new heating boilers and replacing existing domestic hot water boiler with 2 new DHW boilers for an existing apartment building.
Applied Jun 24, 2020 · issued Sep 10, 2020 · Permit 20 159618 MSA
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to unit 103 of an existing condo building.
Applied Jun 6, 2017 · issued Jul 5, 2017 · Permit 17 174755 PLB
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to unit 103 of an existing condo building.
Applied Jun 6, 2017 · issued Jul 5, 2017 · Permit 17 174755 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to unit 103 of an existing condo building.
Applied Jun 6, 2017 · issued Jun 21, 2017 · Permit 17 174755 BLD
- Closed
Plumbing
Plumbing - Interior alterations to existing condo Suite 305.
Applied Feb 5, 2008 · issued Feb 7, 2008 · completed Sep 9, 2025 · Permit 08 109038 PLB
- Closed
Addition or alteration · Interior alterations
Interior alterations to existing condo Suite 305.
Applied Feb 5, 2008 · issued Feb 7, 2008 · completed Sep 15, 2026 · Permit 08 109038 BLD
- Closed (dormant)
Plumbing
install plumbing fixtures per attached (reinstate suite 501 to units 501 and 512)
Applied Apr 24, 2003 · issued Jun 27, 2003 · completed Jun 8, 2026 · Permit 03 126226 PLB
- Inspections under way
Addition or alteration · Multiple projects
make interior alterations and construct demising walls to convert from single dwelling unit to two dwelling units (reinstate suite 501 to units 501 and 512)
Applied Apr 24, 2003 · issued Jun 20, 2003 · 1 home added · Permit 03 126226 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · Mixed use
300 m away · Rezoning · Under review · filed Oct 18, 2024
- Under review
49 storeys · Mixed use
300 m away · Site plan · Under review · filed Oct 18, 2024
Neighbours’ Committee of Adjustment files within 250 m
350 Queens Quay W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).
210 m away · filed Apr 29, 2026 · Approved
350 Queens Quay W · Minor variance
To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.
210 m away · filed Jan 20, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.