Toronto address · Ward 3, Etobicoke-Lakeshore
409 Evans Ave
The City of Toronto has 10 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation · Special ventilation system
REVISION - include technical information on the Air Make-Up Unit that was not in the original permit applicationInstallation of dust collector and make-up air unit.
Applied Oct 19, 2021 · issued Apr 1, 2022 · completed Apr 8, 2022 · Permit 13 264764 MSA (revision 01)
- Closed
Designated structure · Other
proposal to install a dust collector system on concrete pad and support structure, scope includes sprinkler for dust collector
Applied Aug 3, 2017 · issued Sep 1, 2017 · completed Nov 18, 2021 · Permit 17 211070 DST
- Closed
Heating and ventilation · Special ventilation system
proposal to install a dust collector system on concrete pad and support structure, scope includes sprinkler for dust collector
Applied Aug 3, 2017 · issued Mar 13, 2018 · completed Dec 3, 2021 · Permit 17 211078 MSA
- Closed
Temporary structure · Certified tents
Proposal to set up a temporary tent in the parking lot from Oct.6-8/2015.
Applied Sep 29, 2015 · issued Oct 14, 2015 · completed Feb 27, 2019 · Permit 15 230049 TPS
- Closed
Heating and ventilation
HVAC - Proposed interior alteration to existing warehouse space to create showroom areas, storage and new washrooms, and new showers to be installed in existing washrooms.
Applied Jan 15, 2015 · issued Feb 27, 2015 · completed Mar 2, 2020 · Permit 15 104774 HVA
- Closed
Plumbing
Plumbing - Proposed interior alteration to existing warehouse space to create showroom areas, storage and new washrooms, and new showers to be installed in existing washrooms.
Applied Jan 15, 2015 · issued Feb 27, 2015 · completed Jul 28, 2020 · Permit 15 104774 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alteration to existing warehouse space to create showroom areas, storage and new washrooms, and new showers to be installed in existing washrooms.
Applied Jan 15, 2015 · issued Feb 27, 2015 · completed Apr 24, 2017 · Permit 15 104774 BLD
- Closed
Addition or alteration · Other
To revise the footing detail (to sonotubes) for structural pad.Proposal to construct outside structural pad to support dust collector installation and structural roof reinforcement for support of proposed make-up air unit.
Applied Dec 23, 2013 · issued Jan 31, 2014 · completed Oct 20, 2021 · Permit 13 264757 BLD (revision 01)
- Closed
Addition or alteration · Other
Proposal to construct outside structural pad to support dust collector installation and structural roof reinforcement for support of proposed make-up air unit.
Applied Nov 13, 2013 · issued Dec 17, 2013 · completed Oct 20, 2021 · Permit 13 264757 BLD
- Closed
Heating and ventilation · Special ventilation system
Installation of dust collector and make-up air unit.
Applied Nov 13, 2013 · issued Dec 17, 2013 · completed Apr 8, 2022 · Permit 13 264764 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.