Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

41 Butterick Rd

The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Addition(s)

    Proposed two-storey addition and install new HVAC system in existing industrial building.

    Applied Nov 2, 2023 · issued Feb 15, 2024 · completed May 20, 2025 · Permit 23 221695 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed two-storey addition and install new HVAC system in existing industrial building.

    Applied Nov 2, 2023 · issued Feb 26, 2024 · completed Nov 4, 2024 · Permit 23 221695 HVA

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal to install a sprinkler system RELATED TO #15-246973 BLD

    Applied Feb 13, 2019 · issued Jun 20, 2019 · completed Feb 11, 2020 · Permit 19 115013 FSU

    Closed
  • Addition or alteration · Multiple projects

    Proposed interior mezzanine and lunchroom addition (Mezz. 131.42m²) & interior alterations for tea laboratory (Alt. 273.19m²) in existing industrial building.Lunch room has been converted into the meeting room. Revised plan attached.

    Applied Nov 4, 2015 · issued Dec 10, 2015 · completed Jan 30, 2020 · Permit 15 246973 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed interior mezzanine and lunchroom addition (Mezz. 131.42m²) & interior alterations for tea laboratory (Alt. 273.19m²) in existing industrial building.

    Applied Nov 4, 2015 · issued Dec 10, 2015 · completed Feb 10, 2020 · Permit 15 246973 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior mezzanine and lunchroom addition (Mezz. 131.42m²) & interior alterations for tea laboratory (Alt. 273.19m²) in existing industrial building.

    Applied Nov 4, 2015 · issued Dec 10, 2015 · completed Feb 4, 2020 · Permit 15 246973 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a one-storey south side addition to the existing warehouse building.

    Decision: Approved (hearing Jun 21, 2018)

    Filed Apr 24, 2018 · File A0348/18EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 276 Lanor Avenue

    4 homes · Residential

    310 m away · Condominium · Approved · filed Jan 13, 2026

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 47 Bellman Ave · Minor variance

    To construct a new detached dwelling with an attached garage and a covered deck and a cabana in the rear yard.

    250 m away · filed Aug 6, 2025 · Approved

  • 47 Bellman Ave · Minor variance

    To construct a new detatched dwelling with a cabana and a garden suite in the rear yard.

    250 m away · filed Sep 12, 2024 · Refused

  • 260 Lanor Ave · Minor variance

    To construct a one-storey west side addition to the existing dwelling to include a new attached garage.

    210 m away · filed May 24, 2021 · Approved

  • 61 Torlake Cres · Minor variance

    To construct a one-storey rear addition and a partial second storey addition above the existing building.

    240 m away · filed Jul 31, 2019 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.