Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

41 Holland Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to existing rear wood deck attached to rear wall of 1 storey addition. Revision to add enclosed stair addition to rear wall.

    Applied Jun 26, 2008 · issued Aug 25, 2008 · completed Jan 26, 2026 · Permit 07 233160 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - 2 decks, 1 storey addition and Int alterations

    Applied Aug 22, 2007 · issued Aug 30, 2007 · completed Jan 26, 2026 · Permit 07 233160 HVA

    Closed
  • Plumbing

    Plumbing - 2 decks, 1 storey addition and Int alterations

    Applied Aug 22, 2007 · issued Aug 22, 2007 · completed Jan 26, 2026 · Permit 07 233160 PLB (revision 01)

    Closed
  • Plumbing

    Plumbing - 2 decks, 1 storey addition and Int alterations

    Applied Jun 18, 2007 · issued Jul 3, 2007 · completed Jan 26, 2026 · Permit 07 233160 PLB

    Closed
  • Small residential project · Multiple projects

    2 decks, 1 storey addition and Int alterations

    Applied Jun 15, 2007 · issued Jul 3, 2007 · completed Jan 26, 2026 · Permit 07 233160 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 8 Holland Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a new complete second storey addition, a rear two-storey addition, a front covered porch, and a ground floor rear deck. Also, to construct a new rear ancillary building (detached garage). The existing detached garage and shed will be demolished.

    170 m away · filed Aug 15, 2024 · Approved

  • 90 Parma Crt · Minor variance

    To construct two ancillary structures (solar carports) in the existing rear parking lot.

    210 m away · filed May 8, 2024 · Approved

  • 90 Amsterdam Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front porch, a rear ground floor deck, and a rear basement walkout.

    80 m away · filed Aug 8, 2023 · Approved

  • 90 Amsterdam Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    80 m away · filed Aug 8, 2023 · Approved

  • 90 Amsterdam Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front porch, a rear ground floor deck, and a rear basement walkout.

    80 m away · filed Aug 8, 2023 · Approved

  • 130 Yardley Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    220 m away · filed Mar 7, 2022 · Approved

  • 130 Yardley Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a covered front porch, and a rear deck with a basement walkout on the retained lot (Part 2), as described in Consent Application B0025/22TEY.

    220 m away · filed Mar 7, 2022 · Approved

  • 130 Yardley Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a covered front porch, and a rear deck with a basement walkout on the conveyed lot (Part 1), as described in Consent Application B0025/22TEY.

    220 m away · filed Mar 7, 2022 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.