Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

41 William St

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Convert the existing dwelling into a fourplex, 2nd and 3rd floor addition, interior alterations and rear deck

    Applied Sep 15, 2025 · issued Dec 3, 2025 · Permit 25 219580 HVA

    Permit issued
  • Small residential project · Multiple projects

    Convert the existing dwelling into a fourplex, 2nd and 3rd floor addition, interior alterations and rear deck

    Applied Sep 3, 2025 · issued Dec 2, 2025 · 4 homes added · Permit 25 219580 BLD

    Inspections under way
  • Plumbing

    Plumbing - Convert the existing dwelling into a fourplex, 2nd and 3rd floor addition, interior alterations and rear deck

    Applied Sep 3, 2025 · issued Jan 22, 2026 · Permit 25 219580 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 21 John Street

    42 storeys · Mixed use

    380 m away · Site plan · Under review · filed Apr 25, 2023

    Under review
  • 1865-1885 Weston Road

    Residential

    410 m away · Site plan · Under review · filed Dec 28, 2022

    Under review
  • 137-149 Church Street

    53 storeys · 463 homes · Mixed use

    420 m away · Site plan · Under review · filed Sep 21, 2021

    Under review
  • 1821-1831 Weston Road

    45 storeys · Mixed use

    460 m away · Site plan · Under review · filed Apr 19, 2022

    Under review
  • 1828-1844 Weston Road

    45 storeys · 562 homes · Mixed use

    480 m away · Site plan · Under review · filed Dec 23, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 29 William St · Minor variance

    To construct a two storey rear addition, a second storey addition above the existing dwelling, and an attached garage along the west side of the dwelling.

    10 m away · filed Feb 28, 2025 · Deferred

  • 15 Springmount Ave · Minor variance

    To construct a new triplex dwelling.

    80 m away · filed Apr 10, 2024 · Approved

  • 105 John St · Minor variance

    To construct a two-storey rear addition and to enclose an existing front porch.

    100 m away · filed Sep 6, 2023 · Approved

  • 46 William St · Minor variance

    To construct a second storey addition above the existing dwelling, a two-storey rear addition and a new two-storey ancillary building in the rear yard which contains a garage located on the first storey and a garden suite located on the second storey.

    50 m away · filed May 3, 2023 · Approved

  • 92 John St · Minor variance

    To construct a second storey addition, a side entry at west elevation and a front balcony.

    140 m away · filed Jan 25, 2023 · Approved

  • 45 William St · Minor variance

    To construct a garden suite in the rear yard.

    30 m away · filed Jan 13, 2023 · Refused

  • 25 William St · Minor variance

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0406/20EYK) approved variances related to floor space index and side yard setback.

    30 m away · filed Dec 19, 2022 · Approved

  • 5 Wadsworth Blvd · Minor variance

    To construct a new detached dwelling. A previous TLAB decision (TLAB Case File Number 20 112603 S45 05 TLAB) approved variances relating to lot area and lot frontage.

    80 m away · filed Apr 11, 2022 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.