42 Altamont Rd
The City of Toronto has 9 building permits since 2017 (8 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision # 02 - To add supply and return inside attic for HVAC.Rev 1 - Proposed revision to HVAC layout.HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied Dec 9, 2019 · issued Jan 7, 2020 · Permit 18 153697 HVA (revision 02)
- Revision issued
Heating and ventilation
Rev 1 - Proposed revision to HVAC layout.HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied Apr 8, 2019 · issued Jun 18, 2019 · Permit 18 153697 HVA (revision 01)
- Revision issued
New house · New building
Rev 2 - Proposed revision to include rear deck and roof trusses.Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied Apr 5, 2019 · issued Jun 13, 2019 · Permit 18 153697 BLD (revision 02)
- Revision issued
New house · New building
Revision to footing sizes due to bearing capacity.
Applied Oct 22, 2018 · issued Nov 1, 2018 · Permit 18 153697 BLD (revision 01)
- Inspections under way
New house · New building
Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied May 4, 2018 · issued Sep 12, 2018 · 1 home added · Permit 18 153697 BLD
- Closed
Demolition
Proposal to demolish existing 1 storey SFD. See BLS for new dwelling.
Applied May 4, 2018 · issued Sep 12, 2018 · completed Oct 17, 2018 · 1 home removed · Permit 18 153738 DEM
- Inspections under way
Drains and site services
Drain - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied May 4, 2018 · issued Sep 12, 2018 · Permit 18 153697 DRN
- Inspections under way
Plumbing
Plumbing - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied May 4, 2018 · issued Sep 12, 2018 · Permit 18 153697 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See Demo permit.
Applied May 4, 2018 · issued Oct 2, 2018 · Permit 18 153697 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Approved
Minor variance · New R building
To construct a new detached dwelling.
Decision: Approved (hearing Aug 9, 2018)
Filed Jun 25, 2018 · File A0476/18NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
182 Hendon Ave · Minor variance
To construct a new dwelling.
110 m away · filed Sep 10, 2024 · Approved
168 Hendon Ave · Minor variance
To construct a second storey addition to the existing dwelling.
150 m away · filed Jun 17, 2021 · Approved
11 Altamont Rd · Minor variance
To permit an elevator structure within the interior courtyard measuring 5.2 metres above established grade whereas the SiteSpecific By-law 259-2020 (LPAT) and 260-2020(LPAT) do not permit a structure in this location.
210 m away · filed Jun 15, 2021 · Approved
176 Hendon Ave · Minor variance
To construct a new dwelling with an integral garage. File numbers B0024/21NY, A0314/21NY, A0317/21NY will be jointly considered.
130 m away · filed May 2, 2021 · Approved
176 Hendon Ave · Consent
To obtain consent to sever the property into two residential lots. This consent, and its related minor variances, were previously approved by Committee on December 7, 2017 (File Numbers B0061/17NY, A0902/17NY and A0903/17NY). However, the consent conditions were not fulfilled in time and as such the consent approval has lapsed.
130 m away · filed May 2, 2021 · Approved
176 Hendon Ave · Minor variance
To construct a new dwelling with an integral garage. File numbers B0024/21NY, A0314/21NY, A0317/21NY will be jointly considered.
130 m away · filed May 2, 2021 · Approved
176 Hendon Ave · Minor variance
To construct a new three storey dwelling with integral garage. The existing dwelling will be demolished.
130 m away · filed Oct 11, 2017 · Approved
176 Hendon Ave · Minor variance
To construct a new two storey dwelling with integral garage. The existing dwelling will be demolished.
130 m away · filed Oct 11, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.