Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Issuance pending
Drains and site services
Drain - Underground parking garage for two blocks of townhouses
Applied Feb 1, 2021 · Permit 19 234989 DRN
- Closed
Designated structure · Sign building permit related
The applicant has requested to erect six non-illuminated development wall sign on a temporaty decorative plywood board for the sales centre (Refer to 21-115883 TPS 00 for building permit) ****HEATHWOOD HOMES****HEATHWOOD HOMES****
Applied Dec 17, 2020 · issued Mar 29, 2021 · completed Jun 2, 2021 · Permit 20 228394 DST
- Under review
Partial permit · Partial permit - foundation
Part Permit - Underground parking garage for two blocks of townhouses
Applied Nov 27, 2019 · Permit 19 234989 FND
- Issuance pending
Heating and ventilation
HVAC - Underground parking garage for two blocks of townhouses
Applied Oct 10, 2019 · Permit 19 234989 HVA
- Under review
New building
Underground parking garage for two blocks of townhouses
Applied Oct 10, 2019 · Permit 19 234989 BLD
- Issuance pending
Plumbing
Plumbing - Underground parking garage for two blocks of townhouses
Applied Oct 10, 2019 · Permit 19 234989 PLB
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 H02
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B10
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B09
- Under review
New house · New building
Back to back townhouse MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B08
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 P11
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H03
Show 74 more permits
- Under review
New house · New building
Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B05
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P07
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P03
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H10
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B02
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P04
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "A" ELEVATION "CORNER" Underground parking garage
Applied Oct 2, 2019 · Permit 19 230812 H01
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 P08
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H03
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "A" ELEVATION "CORNER" Underground parking garage
Applied Oct 2, 2019 · Permit 19 230812 P01
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H11
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P09
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H06
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P03
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H09
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P06
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P10
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H09
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P08
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 P02
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P04
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H04
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H06
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P06
- Examiner's notice sent
New house · New building - lead
Back to back townhouse MODEL # "A" ELEVATION "CORNER" Underground parking garage
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B01
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B10
- Examiner's notice sent
New house · New building - lead
Construct back to back SFD-Townhouse MODEL # "A" ELEVATION "CORNER" LEAD
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B01
- Under review
New house · New building
Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B07
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B03
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H14
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B11
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B07
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B12
- Under review
New house · New building
Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B14
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P09
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B02
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P07
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P14
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P13
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H02
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 P02
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 H11
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H07
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B03
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 P05
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P12
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H04
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P10
- Under review
New house · New building
Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B04
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H05
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H10
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H12
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B06
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P05
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B06
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B09
- Issuance pending
Plumbing
Plumbing - Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 P11
- Under review
New house · New building
Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B13
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B05
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H08
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 H05
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H07
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230812 H13
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse - MODEL # "D" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P12
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · Permit 19 230840 H08
- Examiner's notice sent
Drains and site services · Site service
Site Services - Back to back townhouse MODEL # "A" ELEVATION "CORNER" Underground parking garage
Applied Oct 2, 2019 · Permit 19 234989 STS
- Under review
New house · New building
Back to back townhouse MODEL # "C" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B11
- Under review
New house · New building
Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230812 B12
- Issuance pending
Plumbing
Plumbing - Construct back to back SFD-Townhouse MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 P01
- Examiner's notice sent
Heating and ventilation
HVAC - Construct back to back SFD-Townhouse MODEL # "A" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230840 H01
- Examiner's notice sent
Heating and ventilation
HVAC - Back to back townhouse MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · Permit 19 230812 H12
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "H" ELEVATION "CORNER"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B04
- Under review
New house · New building
Construct back to back SFD-Townhouse - MODEL # "B" ELEVATION "MIDDLE"
Applied Oct 2, 2019 · 1 home added · Permit 19 230840 B08
- Examiner's notice sent
Demolition
Demolition of existing single family dwelling.
Applied Oct 27, 2017 · 1 home removed · Permit 17 254445 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To permit an elevator structure within the interior courtyard measuring 5.2 metres above established grade whereas the SiteSpecific By-law 259-2020 (LPAT) and 260-2020(LPAT) do not permit a structure in this location.
Decision: Approved (hearing Aug 5, 2021)
Filed Jun 15, 2021 · File A0434/21NY
What’s planned nearby
Development sites within 500 m
- Under review
3 storeys · 2 homes · Mixed use
420 m away · Site plan · Under review · filed May 4, 2021
- Under review
38-42 Finch Avenue West, 2-4 Greenview Avenue and 7 Eldora Avenue
46 storeys · 636 homes · Mixed use
500 m away · Rezoning · Under review · filed Nov 24, 2025
Neighbours’ Committee of Adjustment files within 250 m
89 Finch Ave W · Minor variance
To modify the existing three-storey building by constructing second and third floor additions at the rear of the building.
200 m away · filed Oct 23, 2025 · Approved
182 Hendon Ave · Minor variance
To construct a new dwelling.
130 m away · filed Sep 10, 2024 · Approved
168 Hendon Ave · Minor variance
To construct a second storey addition to the existing dwelling.
150 m away · filed Jun 17, 2021 · Approved
176 Hendon Ave · Consent
To obtain consent to sever the property into two residential lots. This consent, and its related minor variances, were previously approved by Committee on December 7, 2017 (File Numbers B0061/17NY, A0902/17NY and A0903/17NY). However, the consent conditions were not fulfilled in time and as such the consent approval has lapsed.
150 m away · filed May 2, 2021 · Approved
176 Hendon Ave · Minor variance
To construct a new dwelling with an integral garage. File numbers B0024/21NY, A0314/21NY, A0317/21NY will be jointly considered.
150 m away · filed May 2, 2021 · Approved
176 Hendon Ave · Minor variance
To construct a new dwelling with an integral garage. File numbers B0024/21NY, A0314/21NY, A0317/21NY will be jointly considered.
150 m away · filed May 2, 2021 · Approved
89 Finch Ave W · Minor variance
To permit the construction of an elevator to the south side of the existing building in conjunction with converting the existing residential unit on the third storey, into two suites.
200 m away · filed Aug 5, 2019 · Approved
42 Altamont Rd · Minor variance
To construct a new detached dwelling.
210 m away · filed Jun 25, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.